ASSEMBLY OF GREENHOUSE UNIT
The first operation is to connect the two side frames to the end frames to form the outer shape of the
completed structure. Another pair of willing hands would be useful at this stage.
1.
Lift the first side frame into its position by the rear end.
2.
Slot the eaves bar into the small space between the roof and side corner bar so that the gutter
is outside the end frame and the two flanges that form the angle of the roof and side are inside and
tight up against the bolt slots of the roof and side corner bar.
(Key Point).
3.The extra bolts that were inserted in the bolt slots of the corner bars (during rear end and door end
assembly) during the gable end assembly can now be used.
4.
Line up the elongated holes in the flanges of the eaves with the bolt slots and slide the bolts
into them. Put a nut on the top bolt and tighten up. Place the diagonal side angle onto the bottom
bolt, put a nut on and tighten up
. (Key Point).
5.The bottom cill attaches to the inside of the corner bar. The bolt placed in the corner bar bolt slot
at gable end assembly will slide down into the slotted hole at the end of the cill.
6.
Do the same at the other three corners.
7.
Attach the ridge to the roof corner bars by inserting the end of the ridge through the small gap
in the corner bars at the top. The vertical part of the ridge will be outside and pointing skywards and
the two flanges that form the angle of the roof will be inside, tight up against the bolt slots of the
roof corner bars.
Содержание iGrow
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 8: ...SIDE FRAME ASSEMBLY...
Страница 12: ...DOOR END ASSEMBLY viewed from inside...
Страница 16: ...ASSEMBLY OF GREENHOUSE UNIT...
Страница 23: ......
Страница 24: ...ELITE 1303...