8
Example B
2 x 4 cross
framing
Align duct to
center of cooktop
Hood front
Cooktop
outline
NOTE:
Top view ceiling joists
parallel to front of hood
10
1
⁄
16
” (25.5 cm)
install cross-
framing
symmetrically
over duct/cooktop
Centerline
Ø 6” (15.9v
cm) duct
7
1
⁄
16
”
(17.9cm)
16”
(40.6 cm)
joist spacing
Install Range Hood
1
Place the template in the ceiling considering the
instructions for ceiling support structures.
NOTE:
Always consider the front of hood legend when
playing the template on the ceiling.
It will define the control’s location.
2
Mark with a pencil the hole locations for screws and
duct in the ceiling.
Example C
NOTE:
Top view ceiling joists
parallel to front of hood
Align duct to
center of cooktop
Hood front
Cooktop
outline
2 x 4 cross
framing
Ø 6
1
⁄
4
” (15.9
cm) duct
7
1
⁄
16
”
(17.9cm)
16”
(40.6 cm)
joist spacing
10
1
⁄
16
” (25.5 cm)
install cross-framing
symmetrically over
duct/cooktop
Centerline
3
Fix the upper horizontal support with 4 - 5 x 45 mm
screws.
4
Install the 6” (15.2 cm) round transition with 2 - 3.5 x 9.5 mm
screws.
A.
6” round transition
B. Hood
assembly
C.
2 - 3.5 x 9.5 mm screws
B
A
C
B