Terminal Locations Wall Mounting

INSTALLER INFORMATION

Dimension

Terminal Position

Distance (mm)

A*

Directly below an opening,air brick, opening window etc.

600

B

Above an opening,air brick, opening window etc.

300

C

Adjacent to an opening,air brick, opening window etc.

400

D

Below gutters, soil pipes or drain pipes

300

E

Below eaves

300

F

Below balconies of car port roof

600

G

From a vertical drain pipe or soil pipe

300

H

From an internal or external corner

600

I

Above ground roof or balcony level

300

J

From a surface facing the terminal

600

K

From a terminal facing the terminal

600

L

From an opening in the car port (e.g. door , window into the dwelling)

1200

M

Vertically from a terminal on the same wall

1500

N

Horizontally from a terminal on the same wall

300

P

From a vertical structure on the roof

600

Q

Above intersection with roof

150

* I addition, the terminal should not be nearer than 300mm to an opening in the building fabric formed 

for the purpose of accomodating a built in element such as a window frame.

12

Locatie afvoer bij wandmontage

INFORMATIE VOOR DE INSTALLATEUR

Afmeting

Positie uiteinde

Afstand (mm)

A*

Direct onder een opening, ventilatiesteen, openslaand raam enz.

600

B

Boven een opening, ventilatiesteen, openslaand raam enz.

300

C

Naast een opening, ventilatiesteen, openslaand raam enz.

400

D

Onder goten of afvoerpijpen

300

E

Onder dakranden

300

F

Onder balkons of daken van open garages

600

G

Vanaf een verticale afvoerpijp

300

H

Vanaf een binnen- of buitenhoek

600

I

Bovengronds dak- of balkonniveau

300

J

Vanaf een oppervlak tegenover het uiteinde

600

K

Vanaf een uiteinde tegenover het uiteinde

600

L

Vanuit een opening in de open garage (bijv. deur, raam in de woning)

1200

M

Verticaal vanuit een uiteinde aan dezelfde wand

1500

N

Horizontaal vanuit een uiteinde aan dezelfde wand

300

P

Vanaf een verticale structuur op het dak

600

Q

Boven het snijpunt met het dak

150

* Het uiteinde mag daarnaast niet dichter dan 300 mm bij een opening in het gebouw worden 

geplaatst dat is aangebracht voor het plaatsen van een inbouwelement, zoals een raamkozijn.

Содержание Modore 100 H

Страница 1: ...left with the customer for future reference User and installation manual Sky Sky T WARNING THE COMBUSTION CHAMBER OF THIS STOVE SHOULD ONLY BE OPENED AND SERVICED BY A REGISTERED GAS INSTALLER i e GAS...

Страница 2: ...mination 13 Concentric Flue Parts Identification 14 Flue restrictor 21 Wall Terminal Terminations 22 Vertical Roof Terminations 23 Installing Remote Control Electronic Ignition System GV60 26 Arrangin...

Страница 3: ...sh Development Department GENERAL INFORMATION Important Safety Notice This appliance has a ceramic Fire bed arrange ment this contains Refractory Ceramic Fibres which are man made vitreous silicate fi...

Страница 4: ...conform to the relevant standards particu larly in regard to flue sizing and ventilation Refer to documents IS813 ICP3 IS327 and any other rules in force This appliance must be installed in accordance...

Страница 5: ...econds until you hear a sound signal this is the confirmation of a correct communication Caution When installing a new remote control or receiver you must set a new communication code 5 electronische...

Страница 6: ...motor will start to run when the main burner operates you will be able to hear it A 6 3 B A B 3 INFORMATIE VOOR DE GEBRUIKER MAN stand Door kort op de knop SET te drukken doorloopt u achtereenvolgens...

Страница 7: ...ng a 24 hour clock or degrees Fahrenheit F using a 12 hour clock Simultaneously press OFF and small flame until the correct display appears Time The display can indicate time After placing the battery...

Страница 8: ...ng steps Place the appliance in the standby pilot burner position using button small flame Set the day night temperature Choose the TEMP or TEMP function using the SET button Timer for thermostat func...

Страница 9: ...y night temperature if you have not yet done so Set the timer times P1 TIMER P1 TIMER P2 TIMER and P2 TIMER Choose the P TIMER function using the SET button Replacing the battery If the battery is alm...

Страница 10: ...himney has been previously used it must be professionally cleaned and certified as being sound and fit for use The European CE approval on this appliance is restricted to the Flue systems as specified...

Страница 11: ...referenced e g Gas Installations in Timber Frame Buildings from the CORGI installer series in the UK Carport or Building Extension Where a flue terminal is sited within a carport or building extension...

Страница 12: ...ic formed for the purpose of accomodating a built in element such as a window frame 12 Locatie afvoer bij wandmontage INFORMATIE VOOR DE INSTALLATEUR Afmeting Positie uiteinde Afstand mm A Direct onde...

Страница 13: ...1 m higher than the intake supply opening or a window that can be opened If the required distance cannot be achieved the position of the outlet must be at least 1 m above the highest facade roof Impo...

Страница 14: ...centric Flue Pipe 1m Length US 100 100 US 100 130 4 Locking Band USKB 100 USKB 130 5 Protection Band USAB 100 USAB 130 6 Concentric Flue Pipe Adjustable Length 50 300mm USPP 100 USPP 130 7 Vertical Te...

Страница 15: ...15 INSTALLER INFORMATION 15 INFORMATIE VOOR DE INSTALLATEUR...

Страница 16: ...16 INSTALLER INFORMATION 16 INFORMATIE VOOR DE INSTALLATEUR...

Страница 17: ...17 INSTALLER INFORMATION 17 INFORMATIE VOOR DE INSTALLATEUR...

Страница 18: ...18 INSTALLER INFORMATION 18 INFORMATIE VOOR DE INSTALLATEUR...

Страница 19: ...19 INSTALLER INFORMATION 19 INFORMATIE VOOR DE INSTALLATEUR 22 USVK 100 130 REDUCER 130 100 23 USDHC 130 HORIZONTAL TERMINAL 130...

Страница 20: ...T use any restrictor When using a roof terminal Flue system 150 100 and vertical is more than 1 5 meter then use the 35 mm flue restrictor The 35 mm Flue restrictor is located on the inside of the Fi...

Страница 21: ...oogte van een 90 graden bocht 20 cm De maximale hoogte V bij een geveldoorvoer bedraagt 3 meter De horizontale verslepingstabel Bij 0 5 meter verticaal is de maximale horizontale versleping 3 meter Bi...

Страница 22: ...classification 31 it is important to fit a flue restric tor across the flue outlet inside the fire Roof terminations will need the 35 mm flue restrictors fitting This is delivered with the fire Dista...

Страница 23: ...rmateriaal 150 100 te gebruiken INSTALLER INFORMATION Vertical Roof Mounted Termination with Elbow for Rigid Concentric Flue In this situation we recommend to use a reducer USVK towards flue dimension...

Страница 24: ...rmateriaal 150 100 te ge bruiken INSTALLER INFORMATION Vertical Roof Mounted Termination with Angled Elbow for Rigid Concentric Flue In this situation we recommend to use a reducer USVK towards flue d...

Страница 25: ...alkaline and 3 x AAA alkaline respectively Setting the electronics code The receiver has to select the code of the handset please follow the procedure 1 Power up handset 2 Power up receiver LED flash...

Страница 26: ...ment parts are available from your dealer but should only be installed by a qualified installation engineer Ensure that the grate is sitting firmly in the base of the fire box with the long slot in th...

Страница 27: ...vuurbed met houtblokken Aardgas en LPG er of het rooster stevig onder in de vuurkist ligt en dat de lange gleuf in het midden van het rooster n ligt met het midden van de branderbuis De waakvlam moet...

Страница 28: ...ement parts are available from your dealer but should only be installed by a qualified installation engineer Ensure that the grate is sitting firmly in the base of the fire box with the long slot in t...

Страница 29: ...urkist ligt en dat de lange gleuf in het midden van het n lijn ligt met het midden van de branderbuis De waakvlam moet door het rooster en de de vlambeveiliging zichtbaar zijn Leg de stammen zoals op...

Страница 30: ...this before leaving the appliance with the customer Gravel Arrangements Blackstones Brilliants Ensure that the Grate is sitting firmly in the base of the fire box with the long slot in the centre of t...

Страница 31: ...or the finish use special stucco min 100 degrees C resistant or glass fibre wallpaper to prevent discoloration or cracks The false chimney breast and its construction may not rest on the appliance Alw...

Страница 32: ...2H I3B P I3 Supply Pressure mbar 20 30 28 30 37 Nominal Input 14 0 13 0 13 0 Gross kW Efficiency Class 2 2 2 Pilot Burner 446 0330 24 446 0330 44 446 0330 44 Gas Rate 1 31 0 36 0 358 max m3 hr Burner...

Страница 33: ...etal clamps which hold the glass window in place 2 Remove the ceramic bands 3 Remove the glass window by lifting it a little and then bring it forward When the glass window is placed back again DON T...

Страница 34: ...34 INSTALLER INFORMATION Installation of the glass window 1 3 2 Place the windowtrims on the left the right and bottom as shown on picture 1 2 and 3...

Страница 35: ...achter in deze handleiding vermeld Borstel de keramische onderdelen af en vervang eventuele gebroken of beschadigde onderdelen zie eerder in deze handleiding Controleer het keramische koord op de glas...

Страница 36: ...te control within 20 sec until you hear a sound signal confirming that the new code has been set 2 Replace batteries Caution Avoid short circuit between the batteries and metal parts of the appliance...

Страница 37: ...ectly next to the magnet nut at the rear of the gas control The voltage should be at least 5mV within 20 seconds It may not be lower when the appli ance is warm If the voltage is too low the thermocou...

Страница 38: ...ECHNICAL INFORMATION Sky T Sky 194 179 130 200 401 1604 1911 373 299 732 928 880 335 728 1604 135 175 700 2 1599 97 1600 2 675 179 179 130 200 1911 358 1604 414 299 928 358 880 732 728 1604 175 700 16...

Страница 39: ...20 20mbar EE Estonia I2H G20 20mbar ES Spain I2H G20 20mbar FI Finland I2H G20 20mbar FR France I2E G20 G25 20 25mbar GB United Kingdom I2H G20 20mbar GR Greece I2H G20 20mbar HR Croatia I2H G20 20mba...

Страница 40: ...Kingdom I3B P G30 G31 30mbar I3 G30 G31 28 30 37mbar GR Greece I3B P G30 G31 30mbar I3 G30 G31 28 30 37mbar HR Croatia I3B P G30 G31 30mbar HU Hungary I3B P G30 G31 30mbar IE Ireland I3 G30 G31 28 30...

Страница 41: ...Please carefully read and use this installation manual We hereby declare that the design and construction of Element4 s atmospheric gas heating appliance comply with the essential requirements of the...

Страница 42: ...42...

Страница 43: ...43...

Страница 44: ...Element4 B V Paxtonstraat 23 8013 RP Zwolle The Netherlands September 2014...

Отзывы: