Elektror HRD 2 FU 130/7 Скачать руководство пользователя страница 19

19

016341 03.14/07

1

1

 ALLGEMEINE ERSA

TZTEILLISTE FÜR GERÄT HRD 2 FU-130 UND HRD 60 FU-135

11

 GENERAL

 SP

ARE P

A

R

TS LIST FOR DEVICE HRD 2 FU-130 

AND HRD 60 FU-135

DE

EN

Pos.

Benennung

Designation

1

Motorkonsole

Motor base

2

Gummipuf

fer

Rubber buffer

3

Scheibe

Disc

4

Federring

Spring washer

5

Sechskantmutter

Hexagon nut 

6

Motor

Motor

7

Sechskantschraube mit Flansch

Hexagon head screw with 

fl ange

8

V

entilator

fl ansch

Blower 

fl ange

9

Federring 

Spring washer

10

Zylinderkopfschraube

Cylinder head screw

11

V

entilatorgehäuse

Blower housing

12

Laufrad

Impeller

13

Scheibe

Disc

14

W

ellenmutter YN

Shaft nut 

YN

15

Gehäusedeckel

Housing cover

16

Schutzgitter

W

ire mesh guard

17

Sechskantschraube

Hexagonal screw

Содержание HRD 2 FU 130/7

Страница 1: ...3748 Ostfildern Telefon 49 0 711 31973 0 Telefax 49 0 711 31973 5000 info elektror de www elektror de HRD BOOSTED HRD 7 FU 120 HRD 60 FU 135 HRD 2 FU 130 Elektror Hoch druckventilatoren Betriebs und Montageanleitung DE Elektror High Pressure Blowers Operating and assembly instructions EN ...

Страница 2: ... Verunreinigun gen müssen vor Eintritt in den Ventilator ausgefiltert werden Bei Kondensatbildung empfehlen wir eine Kondenswasser bohrung an der tiefsten Stelle im Gehäuse Der Ventilator ist nicht für die Aufstellung im Freien geeignet Bei den Ventilatoren HRD 60 FU 135 HRD 2 FU 130 sind zwischen Motor und Motorkonsole Gummipuffer montiert Beim Ventilator HRD 7 FU 120 sind Gummipuffer unter der G...

Страница 3: ...r Verunreinigungen die ausgeblasen werden könnten zuverlässig zu verhindern müssen diese unbedingt vor Eintritt in den Venti lator ausgefiltert werden Nicht in den Ausblasstutzen hineingreifen 1 8 Temperatur Warnung Das Ventilatorgehäuse nimmt während des Betriebs die Temperatur des Fördermediums an Wenn diese über 50 C liegt muß der Ventilator vom Betreiber vor direktem Berühren geschützt werden ...

Страница 4: ...chtlich der Schwingungs grenzwerte der internationalen ISO 14694 Die weiteren Spezifikationen entnehmen Sie den nachfol genden Informationen Messung am Flanschlagerschild möglichst in Lagernähe Maximal zulässige Schwingungsgeschwindigkeit Grenzwerte nach ISO 14694 2003 E Kategorie BV 3 Starr montiert mm s Flexibel montiert mm s Effektivwert rm s Effektivwert rm s Beim Hersteller 2 8 3 5 Im Einbau ...

Страница 5: ...Motoren liegen im Klemmenkasten der Motoren Anschlusspläne der Lieferung bei 3 4 Erklärung zur EMV Richtlinie 2004 108 EG Unsere Ventilatoren sind Komponenten die zum Einbau durch Fachpersonal in andere Maschinen oder Anlagen be stimmt d h nicht für den Endanwender vorgesehen sind Die Konformität der Endanlage Maschine mit der EMV Richt linie muss vom Hersteller der Endanlage Maschine sicherge ste...

Страница 6: ...ströme auch als Gleichstrom über den Schutzleiter abfließen Sofern ein Schutz durch FI Schutzschalter auf der Versorgungsseite erforderlich ist muss unbedingt ein allstromsensitiver Typ B FI Schutz schalter verwendet werden Der Einsatz eines falschen FI Schutzschalters anders als Typ B kann im Fehlerfall zu Tod oder schweren Verletzungen führen Zur Erfüllung der Norm EN 61800 5 1 muss die Schutzle...

Страница 7: ... Zeitraumes zuverlässig gegen Wiederanlauf ab Stellen Sie ebenfalls sicher dass keine Gefährdungssitu ation in Folge eines Wiederanlaufes nach einem Stillstand entsteht z B in Folge einer Energie Unterbrechung oder Blockade Reinigung oder Wartung dürfen zu keinen Beschädigungen oder Veränderungen am Gerät und seinen Bestandteilen führen die Sicherheits oder Gesundheitsschutz beeinträch tigen und d...

Страница 8: ...die unvollständige Maschine eingebaut werden soll den Bestimmungen der Richtlinie Maschinen 2006 42 EG entspricht Die folgenden harmonisierten Normen wurden angewandt DIN EN 12100 1 Sicherheit von Maschinen Grundbegriffe allgemeine Gestaltungsleitsätze Teil 1 Grundsätzliche Terminologie Methodik DIN EN 12100 2 Sicherheit von Maschinen Grundbegriffe allgemeine Gestaltungsleitsätze Teil 2 Technische...

Страница 9: ...rbe triebsan leitung siehe Motorbe triebsanlei tung 57 96 101 HRD 60 FU 135 11 30 0 16 600 8 100 7 965 siehe Motorbe triebsan leitung siehe Motorbe triebsan leitung siehe Motorbe triebsan leitung siehe Motorbe triebsanlei tung 64 94 101 HRD 7 FU 120 15 30 0 18 500 7 200 7 085 siehe Motorbe triebsan leitung siehe Motorbe triebsan leitung siehe Motorbe triebsan leitung siehe Motorbe triebsanlei tung...

Страница 10: ... condensed water borehole at the lowest point in the housing in the event of formation of condensa tion The blower is not suitable for installation outdoors Rubber pads are installed between the motor and motor con sole with blowers HRD 60 FU 135 and HRD 2 FU 130 Rubber pads are installed below the base plate with blower HRD 7 FU 120 These are supplied with the blower and must always be used The r...

Страница 11: ...he owner must protect the blower against direct contact Risk of burning There may be an increase in the temperature of the medium to be conveyed particularly with higher pressure models when conveying the medium from the air intake side to the discharge side The discharge temperatures can rise to 80 C depending on the operating conditions and temperature of the medium to be conveyed 1 9 Motor circ...

Страница 12: ...hut down 9 0 12 5 The blower shown is only a principle figure The category flexibly mounted applies because of the use of rubber pads Securely screw the device to a firm and level subsurface at the place of operation with sufficient load bearing capac ity and no vibration transmission stress After a storage period of 6 months the blower bearings and motor bearings should be checked before they are...

Страница 13: ... taking into ac count the standards EN 61000 6 4 Emitted interference in industrial environments EN 61000 6 3 Emitted interference in residential environments Blowers with frequency converter operation FC Prior to the start up and during operation of the device on a frequency converter provided that this is suitable it is es sential that the EMC instructions from the frequency convert er manufactu...

Страница 14: ...tion units only HRD 7 FU 120 The enclosed relubrication units should be installed and acti vated before the initial start up Please read the enclosed Quick Installation Instructions for Relubrication Units and the Original Start Vario Operating Instructions The relubrication units continuously release lubricating grease This means that used grease is forced out of the ball bearing area Under certa...

Страница 15: ...safety or health protection and for example impair the balance of the impeller When starting up the blower make sure that all tools or other foreign objects have been removed from inside the device and that all covers and protective grilles have been attached correctly 6 SAFETY RELATED INFORMATION ON TAKING OUT OF OPERATION AND REMOVAL The disconnection of all electrical connections and any other ...

Страница 16: ...machine in which the partially completed machine is to be installed complies with the provisions of the Machinery Directive 2006 42 EC The following harmonised standards have been applied DIN EN 12100 1 Safety of machinery Basic concepts general principles for design Part 1 Basic terminology methodology DIN EN 12100 2 Safety of machinery Basic concepts general principles for design Part 2 Technica...

Страница 17: ...or in struction manual see motor in struction manual see motor instruction manual see motor instruction manual 57 96 101 HRD 60 FU 135 11 30 0 16 600 8 100 7 965 see motor in struction manual see motor in struction manual see motor instruction manual see motor instruction manual 64 94 101 HRD 7 FU 120 15 30 0 18 500 7 200 7 085 see motor in struction manual see motor in struction manual see motor ...

Страница 18: ...18 016341 03 14 07 10 EXPLOSIONSZEICHNUNG FÜR GERÄT HRD 2 FU 130 UND HRD 60 FU 135 10 BROKEN VIEW DRAWING FOR DEVICE HRD 2 FU 130 AND HRD 60 FU 135 ...

Страница 19: ...eibe Disc 4 Federring Spring washer 5 Sechskantmutter Hexagon nut 6 Motor Motor 7 Sechskantschraube mit Flansch Hexagon head screw with fl ange 8 Ventilatorfl ansch Blower fl ange 9 Federring Spring washer 10 Zylinderkopfschraube Cylinder head screw 11 Ventilatorgehäuse Blower housing 12 Laufrad Impeller 13 Scheibe Disc 14 Wellenmutter YN Shaft nut YN 15 Gehäusedeckel Housing cover 16 Schutzgitter...

Страница 20: ... 22 23 24 25 26 20 27 29 28 21 Anziehmoment 75 Nm Tightening torque 75 Nm 1 2 8 6 5 4 7 5 6 3 18 19 9 10 11 12 10 13 14 016341 03 14 07 10 EXPLOSIONSZEICHNUNG FÜR GERÄT HRD 7 FU 120 10 BROKEN VIEW DRAWING FOR DEVICE HRD 7 FU 120 ...

Страница 21: ...sführung Produktklasse C ISO 7093 C ST 10 100 H Washer large version product class C ISO 7093 C ST 10 100 H 12 Unterlegscheibe DIN 125 A 10 5 Washer DIN 125 A 10 5 13 Sechskantschraube Hexagon head screw 14 Sechskantschraube mit Flansch Hexagon head screw with fl ange 15 Zylinderkopfschraube DIN 912 M12 x 50 Cylinder head screw DIN 912 M12 x 50 16 Motor VAF 132FM Motor VAF 132FM 17 Sechskantmutter...

Страница 22: ...n erforderlich Der Star Vario Antrieb ist wiederverwendbar Die Nachschmiereinheit kann auch als Komplett Set bestellt werden Hinweis Für einen Ventilator sind immer jeweils 2 Einheiten erforderlich Der Antrieb B ist wiederverwendbar Das Batterie Set C muss jährlich getauscht werden Die LC Einheit D ist nicht wiederbefüllbar Die Nachschmiereinheit kann auch als Komplett Set bestellt werden Note 2 u...

Страница 23: ... für die Bestellung einiger Ersatzteile entscheidend Ermitteln Sie die Stellung Ihres Ventilators durch Blick auf die Saugseite Bestellen Sie Er satzteile zur Drehrichtung passend Rechtsdrehend Ar bis Dr Linksdrehend El bis Hl You can download your customised spare parts list on the internet at www elektror com My Elektror For this purpose you require the appliance s serial number refer to rating ...

Страница 24: ...nternet unter www elektror de Gerne steht Ihnen auch unser Customer Support unter der Rufnummer 49 0 711 31973 111 zur Verfügung You will find further information about our products on the internet at www elektror com Our Customer Support staff will be pleased to answer your queries at 49 0 711 31973 111 Hellmuth Hirth Strasse 2 D 73760 Ostfildern Postfach 12 52 D 73748 Ostfildern 49 0 711 31973 0...

Отзывы: