![Elektron 328 008 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/elektron/328-008/328-008_operating-manual_2386798026.webp)
Resistance Welder MULTISPOT MI-100-3
Installation
26
5.6 Connecting the pliers
Fig.24: Connecting the pliers
1.
Push the main plug of the welding pliers into the main socket of
the equipment (Fig.24/1.).
2.
Turn the retainer nut clockwise (Fig.24/2.) to lock the
connection.
Fig.25: Water cooling system for the pliers
3.
Connect the water cooling system of the pliers.