ELEKTRA VCDR
Heating Cables
Stage 3
Installation of temperature
and moisture sensors
The moisture sensor should be placed at the
bottom of the gutter, on the south facing wall.
The external temperature sensor should be
installed on the north facing wall, not directly
exposed to sunlight.
The air temperature and moisture sensors’ wires
should be fed into the enclosure where the
controller will be positioned.
The sensors’ wires can be extended using a
control cable (the temperature sensor’s wire using
a 2x1.5 mm
2
-diameter wire, and the moisture
sensor’s wire using a 4x1.5 mm
2
-diameter wire),
with a heat shrink joint set.
Moisture sensor positioned in the gutter
20
Содержание VCDR
Страница 2: ......
Страница 11: ...Gutter holder Gutter spacing wire with clips Cable fixing in the gutter with a wire with clips 11 ...
Страница 28: ...www elektra eu ...
Страница 30: ......
Страница 39: ...Uchwyt do rynien Linka z uchwytami Mocowanie przewodów w rynnie za pomocą linki z uchwytami 39 ...
Страница 47: ...Przewody zasilające Omomierz Megaomomierz Pomiar rezystancji żyły grzejnej Pomiar rezystancji izolacji 47 ...
Страница 56: ...www elektra pl ...
Страница 58: ......
Страница 67: ...Крепеж для желобов Трос с клипсами Крепление кабелей в желобе при помощи троса с клипсами 67 ...
Страница 84: ...www elektra eu EN PL RU 2017 07 ...