17
Step III –
after fixing the cable
to the floor
When the cable has been fixed to the floor the
following actions should be performed:
• the area directly under the connecting joint
between the heating cable and the cold tail
should be deepened, as the joint is thicker
than the heating cable,
• enter the heating cable cold tail into the
installation box through the protective conduit
mounted at the step 1: preparation,
• enter the temperature sensor cable into the
installation box,
• make a sketch (or photograph) of the heating
cable floor arrangement and the temperature
sensor position in the Warranty Card,
• perform measurements:
- heating wire resistance,
- insulation resistance.
Caution:
The temperature sensor cable
should be positioned just between
the heating cables.
Содержание ELEKTRA DM
Страница 2: ......
Страница 28: ...ESG EN 403 Grupa V5 12 10 0 1 a www elektra eu ...
Страница 30: ......
Страница 56: ...ESG PL 403 Grupa V5 11 10 0 1 b www elektra pl ...
Страница 58: ......
Страница 84: ...ESG RU 403 Grupa V5 12 10 0 1 a www elektra otoplenie ru ...