
13
Gas installation
Mount a manual shutt-off valve prior to the dryer.
The gas pipe to the dryer must be dimensioned to an output
of 6.6 kW / 8 kW.
From factory the nozzle pressure setting corresponds to the
heating value printed on the data label on the back of the dryer.
Check that the nozzle pressure and heating value are according
to the values given in the table. If not, contact the supplier.
Bleed the pipe system before connecting the dryer.
After connection, test all joints for leaks.
Installation
To be carried out by qualifi ed personnel
Содержание T4190
Страница 1: ...Installation manual T4190 Compass Control 487 05 42 61 00 EN ...
Страница 2: ......
Страница 4: ...4 4 ...
Страница 22: ......
Страница 23: ......
Страница 24: ...www electrolux com professional Share more of our thinking at www electrolux com ...