![Electrolux Ecostore Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/electrolux/ecostore/ecostore_user-manual_22092016.webp)
16
M
Ma
aiin
ntte
en
na
an
ncce
e,,
iin
nssp
pe
eccttiio
on
nss,, cch
he
ecckkss
a
an
nd
d cclle
ea
an
niin
ng
g
F
Frre
eq
qu
ue
en
nccyy
R
Re
essp
po
on
nssa
ab
biilliittyy
Electrical control
panel
• check the electrical
components
installed inside the
electrical control
panel. Check the
wiring between the
electrical panel and
machine parts.
Yearly
Service
Electrical connection
cable and plug
• check the connec-
tion cable (replace
if necessary) and
plug
Yearly
Service
M
Ma
aiin
ntte
en
na
an
ncce
e,,
iin
nssp
pe
eccttiio
on
nss,, cch
he
ecckkss
a
an
nd
d cclle
ea
an
niin
ng
g
F
Frre
eq
qu
ue
en
nccyy
R
Re
essp
po
on
nssa
ab
biilliittyy
General machine
overhaul
• check all compo-
nents, electrical
equipment, corro-
sion, pipes…
Every 10
years
1
Service
1.
the machine is designed and built for a duration of about 10 years. After
this period of time (from commissioning) the machine must undergo a
general inspection and overhaul. Some examples of checks to be
carried out are given below.
• check for any oxidised electrical components or parts; if
necessary, replace them and restore the initial conditions;
• check the structure and welded joints in particular;
• check and replace bolts and/or screws, also checking for
any loose components;
• check the electrical and electronic system;
• check the functionality of safety devices;
• check the general condition of protection devices and
guards.
NOTE!
It is advisable to stipulate a preventive and sched-
uled maintenance contract with the After-Sales
Service.
Содержание Ecostore
Страница 17: ......
Страница 18: ...Electrolux Professional SPA Viale Treviso 15 33170 Pordenone www electrolux professional com ...