- 24 -
Spares Operation - R.Kurzke 02/05
599 521 951
EN
The floor of the machine is held with screws
at the front, and clipped in at the back.
It contains the bosses for the overflow
water and the flooding switch.
After removal you come to the most
important functional components.
After loosening the screws
of the two holders and the
yoke, the tumble pump/
continuous flow heater unit
can be taken out.
The bayonet breech of the
pump chamber can be
simply released, for
possible cleaning.
Содержание COMPACT MIDI + EDW 500
Страница 4: ... 4 Spares Operation R Kurzke 02 05 599 521 951 EN 2 Programs ...
Страница 11: ... 11 Spares Operation R Kurzke 02 05 599 521 951 EN 5 Water Course Scheme ...
Страница 17: ... 17 Spares Operation R Kurzke 02 05 599 521 951 EN 14 In and Output elements ...
Страница 28: ... 28 Spares Operation R Kurzke 02 05 599 521 951 EN 18 1 Connections ...
Страница 29: ... 29 Spares Operation R Kurzke 02 05 599 521 951 EN 18 2 Wiring ...