
Data di emissione: Agosto, 2019 Revisione: 0 Pag. : 9/24
-
R
eassemble the upper mixing unit (O) so that
its toothed crown is aligned with the lower
crown. This will allow the front pin to fit
perfectly into its fixed position on the bowl (see
figure 11).
-
R
emove the liquid-collector tray (AA) turning
it slightly upwards and pulling it forward (see
figure 12). Wash each part thoroughly, then
reassemble the parts by inversely following the
procedures described above.
-
P
lug the unit back into appropriate power
supply the machine is now ready to operate
again.
S
ANITIZING
W
henever the machine has remained unused
for some days after been cleaned and sanitized
as described previously, the sanitizing
procedures described below must be performed
just prior to start-up the machine.
-
R
emove the main cover and the secondary
transparent one.
-
P
our sanitizing solution (
S
odium
H
ypochlorite 2%) into the bowl carefully
following the manufacturer prescriptions.
-
A
fter restoring the main cover, switch on the
machine and let the auger rotating leaving the
sanitizing solution for the time specified by its
producer.
!Important!
N
ever let the sanitizer inside the bowl for
more than 15 minutes.
-
D
rain the solution by opening the plunger to
allow the bowl to empty.
O
pen and close the
plunger at least 10 times during draining to
sanitize the product way out area also.
-
T
horoughly rinse repeating these operations
with clean water instead of sanitizer solution.
-
N
ow the machine is ready to be used.
Fig. 11
Fig. 12
Содержание SORBY DREAM 1
Страница 20: ...Data di emissione Agosto 2019 Revisione 0 Pag 20 24 14 WIRING DIAGRAM ...
Страница 21: ...Data di emissione Agosto 2019 Revisione 0 Pag 21 24 ...
Страница 22: ...Data di emissione Agosto 2019 Revisione 0 Pag 22 24 ...
Страница 23: ...Data di emissione Agosto 2019 Revisione 0 Pag 23 24 ...