background image

LX7406 Owner's Manual 

 

Revised February 21, 2019 

Page 14 

 

800.445.7846  ·  www.electro-mech.com 

TESTING, OPERATION, AND ONGOING CARE 

After all power, data, and other connections are in place, it is time to test the locker 

room clock.  Apply power to the locker room clock display first.  Although there is no 

harm in powering the control console first, powering the clock first should result in the 

numeric displays remaining blank.  Seeing any LEDs illuminated on a locker room clock 

display prior to the availability of data from the control console would indicate a problem 

inside of the locker room clock cabinet. 

Next, power up the control console.  For wired setups, connect any stereo patch cables 

to the data output ports on the back of the control console.  The other ends of these 

patch cables are typically plugged into junction boxes, but may be plugged directly into 

the data input port on the side of the locker room clock. 

The locker room clock display should begin showing data within a few seconds, 

displaying the same information as the clock on the main scoreboard display.  The 

console buttons that control the main scoreboard clock also control the locker room 

clock.  For more details about how the control console works, consult the 

documentation that ships with it. 

Scheduled Testing and Maintenance 

The locker room clock does not require scheduled maintenance procedures.  However, 

it is important to check for problems prior to a game.  We recommend running through 

the tests described above between two and four weeks prior to the start of a season (or 

anytime you plan to use the locker room clock after a gap of more than a month).  

During the season, test out the locker room clock the day before each game. 

After the Game, and After the Season 

Whenever you are not using your locker room clock, use the disconnect switch to cut 

power to the display.  You should unplug the control console from its power source and 

from the data cables as well.  It is not necessary to take steps beyond this, even if the 

locker room clock will not be used for several months. 

 

 

 

Содержание LX7406

Страница 1: ...plain how to install and maintain the Electro Mech Model LX7406 Indoor Locker Room Clock Operation of the clock is covered in the manual that ships with the control console for the main scoreboard dis...

Страница 2: ...ech com TABLE OF CONTENTS Best Practices for Personal Safety and Product Care 3 Product Specifications 4 Planning Your Scoreboard Installation 6 Electrical Installation 8 Mechanical Installation 12 Te...

Страница 3: ...adhere to the surface and damage the finish Conditions of Installation and Use for an Indoor Locker Room Clock This locker room clock display is designed for installation and use in a dry environment...

Страница 4: ...Optional vinyl accent striping is available in eighteen standard colors Overview of LED Display Circuit Boards Red LEDs light emitting diodes mounted on PCBs printed circuit boards form all lighted d...

Страница 5: ...icated breaker to control power to the locker room clock Mounting Requirements Locker room clocks are designed to be mounted on a wall The cabinet includes two keyhole slots in the back to accept lag...

Страница 6: ...r to prevent people from smacking their heads against it For some indoor facilities it is important to make sure people cannot accidentally or intentionally interfere with the locker room clock displa...

Страница 7: ...er room clock model Before purchasing materials running cabling etc you should verify with the factory that you have the right documentation for your unique project It is possible that a government ag...

Страница 8: ...scoreboard package includes other special accessories such as a sound system electronic message center or video display there may be additional cabling and conduit needed to support this equipment Ple...

Страница 9: ...rmination for the data cables The idea is to connect the clock to a junction box via a patch cable So the junction box will need to be mounted near the clock usually no more than 10 feet apart In many...

Страница 10: ...lock displays will behave unpredictably if it is divided between two destinations There are other options for getting synchronized data to two locations including daisy chaining which will be discusse...

Страница 11: ...uld be soldered to this terminal The terminal that extends further from the center of the plug body connects to the ring of the plug Solder the red wire here The strain relief tabs are connected to th...

Страница 12: ...techniques may more appropriate for hanging the display on other structures However for the sake of clarity and brevity we will assume a wall We will further assume that the wall is capable of suppor...

Страница 13: ...2019 LX7406 Owner s Manual www electro mech com 800 445 7846 Page 13 Below are the standard dimensions of an LX7406 locker room clock Lag bolts for hanging the clock should be placed 18 inches apart f...

Страница 14: ...er room clock display should begin showing data within a few seconds displaying the same information as the clock on the main scoreboard display The console buttons that control the main scoreboard cl...

Страница 15: ...ind on the bottom of the control console a product label which gives the software version If you are reading this manual in search of help with a different scoreboard model for outdoor scoreboards you...

Страница 16: ...less than three business days Electro Mech maintains a supply of common parts for immediate shipment Some customers choose to purchase new parts for immediate use and will later send old parts back to...

Страница 17: ...le components are accessible by removing the face of the locker room clock cabinet The next section of this document discusses removing and replacing the illuminated PCB assembly In the unusual situat...

Страница 18: ...of the display leaving for last one of the screws along the top Support the face piece with one hand as you remove the final screw Rotate the face so that you can see the PCB behind it and the cable...

Страница 19: ...y removing the digit assembly from the front of the cabinet From the power terminal block or from the back of the AC socket the line side of AC passes through a 5 amp fuse on the way to the Mean Well...

Страница 20: ...elow lists the names and purposes of the various connectors on the LX Driver LX17 Driver Functions Connector Function J2 Data In N A or rarely from ScoreLink J3 Data Out To Data Out Socket J4 Word 1 L...

Страница 21: ...nt Parts or Equipment will be new or serviceably used comparable in function and performance to the original Parts or Equipment and warranted for the remainder of the warranty period Purchasing additi...

Страница 22: ...but not limited to wireless systems copper wire fiber optic cable conduit or trenching for the purpose of overcoming local site interference Any statements regarding products or services made by sale...

Отзывы: