
Doc
#
E180701
2-9
2: Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
2.3: Installation Step 3 - Mount the Enclosure
1. Determine the enclosure mounting location - where there are no obstacles and the
exterior wiring can be easily accomplished. Install as per the NEC or local code
requirements. Refer to the following diagrams for the enclosure dimensions.
Figure 2.5: Enclosure Front Dimensions
516.19 mm
20.32 in
517.91 mm
20.39 in
Содержание Shark MP200
Страница 1: ...V 1 07 June 24 2019 ...
Страница 2: ...This page intentionally left blank ...