background image

     

Doc

#    

E180701     

                              

           1-4

 1:Introduction        

Electro 

Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions

Electro 

Industries/GaugeTech

The Leader In Power Monitoring and Smart Grid Solutions

                                This page intentionally left blank.

Содержание Shark MP200

Страница 1: ...V 1 07 June 24 2019 ...

Страница 2: ...This page intentionally left blank ...

Страница 3: ...ing photocopying record ing or information storage or retrieval systems or any future forms of duplication for any purpose other than the purchaser s use without the expressed written permission of Electro Industries GaugeTech 2019 Electro Industries GaugeTech Shark is a registered trademark of Electro Industries GaugeTech The distinctive shapes styles and overall appearances of all Shark meters a...

Страница 4: ...of shipment During the warranty period we will at our option either repair or replace any product that proves to be defective To exercise this warranty fax or call our customer support department You will receive prompt assistance and return instructions Send the instrument transporta tion prepaid to EIG at 1800 Shames Drive Westbury NY 11590 Repairs will be made and the instrument will be returne...

Страница 5: ...uracy standards In general EIG metering devices should not require regular adjustments to maintain published accuracy Disclaimer The information presented in this publication has been carefully checked for reliabil ity however no responsibility is assumed for inaccuracies The information contained in this document is subject to change without notice Symbols Used in This Manual This warning symbol ...

Страница 6: ... Electro Industries GaugeTech the leader in power monitoring and control continues to revolutionize the industry with the highest quality cutting edge power monitoring and control technology on the market today An ISO 9001certified company certificate on the EIG website at https elec troind com about electro industries EIG sets the industry standard for advanced power quality and reporting revenue...

Страница 7: ...ymbols Used in This Manual iii About Electro Industries GaugeTech EIG iv 1 Introduction 1 1 1 1 Product Handling 1 1 1 2 Safety Precautions 1 2 1 3 Storage 1 3 1 4 Compliance 1 3 2 Installation 2 1 2 1 Installation Step 1 Unpack the Enclosure 2 2 2 2 Installation Step 2 Drill the Wiring Holes 2 4 2 2 1 Removing and Reinstalling the Panel 2 7 2 3 Installation Step 3 Mount the Enclosure 2 9 2 4 Inst...

Страница 8: ... Power Monitoring and Smart Grid Solutions Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions 4 1 Overview 4 1 4 2 Troubleshooting 4 1 5 Maintenance 5 1 A Removing a Meter from Service A 1 A 1 Removing the Meter A 1 A 2 Reinstalling the Meter A 6 ...

Страница 9: ...tore these documents in a safe place 1 Introduction The MP200TM in Enclosure lets you expand your switchgear capability and or easily meter circuits without expensive and time consuming redesign Simply mount the enclosure in any convenient location next to your switchgear or on a wall and you are ready to go with no downtime This is an ideal solution for a retrofit when there is no metering compar...

Страница 10: ...tensions dangereuses peuvent provoquer la mort ou des blessures graves suivre l installation adéquate le fonctionnement et les procédures de maintenance pour éviter ces tensions Completely read and understand the material presented in this document before attempting installation operation or application of the equipment In addition only qualified persons should be permitted to perform any work ass...

Страница 11: ...well packaged this equipment should not be stored outdoors If the equipment is to be stored indoors for any period of time it should be stored with its protective packaging in place Refer to the MP200TM Metering System Installation and Operation manual on the enclosed CD for the meter s storage requirements The temperature rating for enclosure storage is 20 to 60 oC 4 to 140 oF 1 4 Compliance UL c...

Страница 12: ... Introduction Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions This page intentionally left blank ...

Страница 13: ...o make certain that there are no pipes wires or other mounting hazards in the immediate mounting area that could create a problem Also make sure you have enough clearance around the enclosure to run wiring to it safely EIG recommends at least 2 feet of clearance around the enclosure See Section 2 1 for enclosure dimen sions Carefully remove all packing material from the unit Even though an equipme...

Страница 14: ...and Smart Grid Solutions 2 1 Installation Step 1 Unpack the MP200TM in Enclosure The MP200TM in enclosure ships in two parts The meter enclosure The mountable color display The display is shipped separately in order to protect it from being damaged during shipping Instructions for the enclosure begin on the next page Section 2 4 contains instructions for mounting the display ...

Страница 15: ...e components are shown in the image below A MP200 current inputs 24 of them B CT shorting blocks 8 of them C CT connections D Voltage inputs and 5 fuses E Earth ground on inside of enclosure F Ground wire on enclosure door G Cable assembly H Display connectors I Hole for mounting the display J If ordered optional Add on Protocol ProtoCom ProtoCom Lon Figure 2 1 MP200TM in Enclosure as Shipped J F ...

Страница 16: ...nd communications wiring See the figure below for the allowable location Figure 2 2 Location for Punch Entries The drawings show the area in the bottom of the enclosure where wiring holes can be cut 1 25 40mm from the front of the enclosure 1 5 38 10mm from the right side of the enclosure 1 5 38 10mm from the back of the enclosure and 3 75 95 25mm from the left side of the enclosure PP LQ PP LQ 3 ...

Страница 17: ...r what procedure is used the installer shall verify that the hole cutting process will not damage any of the wiring or components installed inside or on the enclosure a The two recommended procedures for cutting the wire entry holes are as follows Use a C frame punch to cut the wire entry holes This type of punch does not require a pilot hole A typical C frame punch is shown below Figure 2 3 C Fra...

Страница 18: ...aterial If a vacuum is not available use an alternate method to clean the inside of the enclosure Do not use compressed air or pressurized gas to clean the inside of the enclosure as this may force cuttings into areas that cannot be seen creating a hazard ous condition IMPORTANT All wire entry into the enclosure shall be accomplished with the use of recognized fittings or strain reliefs Bare holes...

Страница 19: ...ProtoCom Lon add on protocol unit remove all connections from the ProtoCom ProtoCom Lon I 2 Disconnect the green ground wires from the door E 3 Open the cable clamps on the door J and remove the cable assembly F 4 Remove the green ground wires on the lower left side of the enclosure D 5 Remove the four nuts one in each corner of the panel K 6 Carefully remove the panel from the enclosure Drill the...

Страница 20: ...rt Grid Solutions 2 Connect the green ground wires to the ground stud on the bottom left of the enclosure D 3 Insert the cable assembly F into the cable clamps on the door J 4 Connect the two green ground wires to the stud on the door E 5 If the MP200TM in enclosure is equipped with a ProtoCom ProtoCom Lon attach all connections to it I Continue to Section 2 3 to mount the enclosure ...

Страница 21: ...nd Smart Grid Solutions 2 3 Installation Step 3 Mount the Enclosure 1 Determine the enclosure mounting location where there are no obstacles and the exterior wiring can be easily accomplished Install as per the NEC or local code requirements Refer to the following diagrams for the enclosure dimensions Figure 2 5 Enclosure Front Dimensions 516 19 mm 20 32 in 517 91 mm 20 39 in ...

Страница 22: ...ries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Figure 2 6 Enclosure Side Dimensions 508 00 mm 20 00 in 166 31 mm 6 54 in 185 67 mm 7 31 in ...

Страница 23: ...tion Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Figure 2 7 Enclosure Top Dimensions 508 00 mm 20 00 in ...

Страница 24: ...e mounting points using attachment means appropriate for the surface supporting the enclosure 4 Put two fasteners screws or bolts in the top two mounting locations the fasteners shall have a head diameter of no greater than 0 65 and a maximum body diameter of 0 25 5 Install upper mounting screws leave a 3 8 gap between the screw head and the mounting surface 6 Lift the enclosure and hang it from t...

Страница 25: ...m the inside of the cabinet Loosely tighten 8 If necessary shim between the mounting surface and the enclosure to compensate for any irregularities 9 Tighten the lower two fasteners Figure 2 9 Location of Mounting Screws 10 Fold back the CT wiring labels in the upper right and left corners of the enclosure see figure above and tighten the upper two mounting fasteners Bend up label to get acces to ...

Страница 26: ... 10 10 Display Kit Contents 1 Display 2 Rear Module 3 Power Supply 4 RS485 Serial Cable 10 feet Mounting Hardware 5 anti rotation tee 6 socket wrench 7 installation nut attached to the back of the display These items are included in the display box but are only needed if you want to mount the display remotely rather than in the enclosure If you are mounting remotely cover up the display mounting h...

Страница 27: ...ader In Power Monitoring and Smart Grid Solutions 1 There are 5 parts to the display as installed in the MP200TM in enclosure Figure 2 11 Display Components for Mounting in Enclosure Display module and touch screen 1 Panel with cutout 8 Display installation nut 7 Anti rotation Tee 5 Rear module containing the electronics to run the display 2 5 1 8 7 2 ...

Страница 28: ...ed 9 Figure 2 12 Inserting the Display into the Panel 3 Insert the display module with the anti rotation Tee attached into the cutout aligning the anti rotation tee so that it passes through the small hole in the panel 10 4 Place the display installation nut on the portion of the display passing through the panel and finger tighten it 5 Using the socket wrench supplied 6 tighten the display instal...

Страница 29: ...nd Smart Grid Solutions Figure 2 13 Connecting the Rear Module to the Display Module 6 Carefully insert the rear module 2 with the yellow button to the top of the enclosure and push the rear module until it locks into place When it is in place you will hear a click 7 Connect the cable to the rear module see Figure 2 1 Insert and push Free Locked Top of panel Yellow button 2 2 1 ...

Страница 30: ...e enclosure has been fitted with means for securing the door so it cannot be opened or tampered with A key lock is provided along with two keys Figure 2 14 Location of Enclosure Lock 1 Lock the enclosure by putting the key in the lock and turning it clockwise 2 Remove the key and store it in a safe place When you want to open the enclosure put the key in the lock and turn it counter clockwise Repe...

Страница 31: ...PRODUIT DOIVENT FAIRE UN FIL DE CUIVRE SEULEMENT Both enclosure models are pre wired and programmed for either three phase or single phase operation NOTE The current inputs are only to be connected to external current transformers provided by the installer The CT s shall be Listed to ANSI IEEE C57 13 and rated for the current of the meter used A DISCONNECTING MEANS AND UPSTREAM PROTECTION SHOULD B...

Страница 32: ...tions Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions 3 1 Wiring Instructions WARNING First connect Earth Ground as shown in the figure below AVERTISSEMENT Branchez d abord la mise à la terre comme indiqué dans le dessin ci dessous Figure 3 1 Earth Ground Connection Earth Ground ...

Страница 33: ...ng options Understand your sys tem and use the appropriate figures WARNING CONTROL WIRING MAY HAVE VOLTAGE PRESENT THAT CAN CAUSE SEVERE PERSONAL INJURY OR DEATH DE ENERGIZE ALL CONDUCTORS BEFORE BEGINNING TO PERFORM ANY WIRING ACTIVITY TO OR WITHIN THE MP200TM IN ENCLOSURE AVETISSEMENT LE CÂBLAGE DES COMMANDES PEUT AVOIR UNE TENSION PRÉSENTE QUI PEUT PROVOQUER DES BLESSURES GRAVES POU LA MORT MET...

Страница 34: ...id Solutions Figure 3 2 MP200 Y Three Phase Wiring Diagram Earth Ground U U CURRENT A HI CURRENT A LO CURRENT B HI CURRENT B LO CURRENT C HI CURRENT C LO WHITE BLACK WHITE BLACK WHITE U V3 V2 V1 UNIT POWER L U U U U TO MP200 VOLTAGE POWER INPUTS V4 U V3 V2 V1 N LINE U CT SHORTING BLOCK ONLY ONE 3 PHASE CIRCUIT IS SHOWN DUPLICATE IT FOR ADDITIONAL CIRCUITS BLACK LOAD TO MP200 CURRENT INPUTS U ...

Страница 35: ...Grid Solutions Figure 3 3 MP200 S Single Phase 2 Wire Wiring Diagram Earth Ground U U CURRENT 1 HI CURRENT 1 LO CURRENT 2 HI CURRENT 2 LO WHITE BLACK WHITE U U CURRENT 3 LO WHITE BLACK CURRENT 3 HI V3 V1 UNIT POWER L U TO MP200 VOLTAGE POWER INPUTS U V2 V4 U U N LINE CT SHORTING BLOCK ONLY ONE 3 PHASE CIRCUIT IS SHOWN DUPLICATE FOR ADDITIONAL CIRCUITS BLACK LOAD TO MP200 CURRENT INPUTS U V1 ...

Страница 36: ...tions Figure 3 4 MP200 S Single Phase 3 Wire Wiring Diagram U CURRENT 1 HI CURRENT 1 LO WHITE U V1 V4 V1 V2 V3 UNIT POWER L TO MP200 VOLTAGE POWER INPUTS U U U N LINE CT SHORTING BLOCK ONLY ONE CIRCUIT IS SHOWN DUPLICATE FOR ADDITIONAL CIRCUITS BLACK LOADS FUSE BLOCK U U V1 V2 V2 TO MP200 CURRENT INPUTS Run lines VL1 and VL2 through the CT in opposite directions Set PT ratio to half in the meter U...

Страница 37: ...iting type terminal blocks are provided for the current transformer circuit and are equipped with captive shorting screws see instructions in Section 5 1 The temperature rating for enclosure operation is 0 to 50 o C 32 to 122 o F Refer to the MP200TM Metering System Installation and Operation Manual for specific operating instructions for the system in your enclosure 4 2 Troubleshooting Symptom Ex...

Страница 38: ... 4 Operation Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions This page intentionally left blank ...

Страница 39: ...pplication conditions and the importance placed on dependable operation and inspection you should perform maintenance checks on a regularly scheduled basis Visually inspect for loose parts wires and or hardware inspect for discoloration of insulation and damaged or discolored compo nents be alert for accumulation of dirt and or moisture on structure check operation of disconnecting means and conti...

Страница 40: ...5 Maintenance Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions This page intentionally left blank ...

Страница 41: ...hree Phase WYE S Single Phase Only 3 Frequency 50 50Hz 60 60Hz 4 Current Class 10 10 Amp Secondary 2 2 Amp Secondary 5 V Switch Key Pack V1 Transducer V2 Basic Logger V3 Advanced Logger 6 Communication X RS485 Only Modbus WIFI Ethernet and WiFi Modbus 7 Display MDSN 3 5 Touch Screen HMI Display with installation kit MDLN 5 7 Touch Screen HMI Display with installation kit Display Installation Kit i...

Страница 42: ... Smart Grid Solutions Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Example above ENCSMP200 Y 60 10 V2 X MDSN ProtoCom MP200 Y Metering System with 60Hz frequency Current Class 10 V 2 V Switch key RS485 only MDSN 3 5 Touch Screen HMI Display and ProtoCom converter ...

Страница 43: ... damage to personnel and or equipment can occur if the screws provided on the shorting block are not installed in the correct locations prior to disconnecting any wires AVERTISSEMENT Si le compteur doit être enlevé du service le côté secondaire du transformateur actuel DOIT être court circuité pour prévenir une condition de haute tension dangereuse d apparaitre dans les câblages secondaires du tra...

Страница 44: ...In Power Monitoring and Smart Grid Solutions Les vis doivent être vissées jusqu à ce que la vis soit en contact avec la barre interne permettant à la barre de devenir électriquement commune à la bar rette de raccordement et mise à la terre The figure below shows where the screws are located that must be tightened down to short the CTs Figure A 1 CT Shorting Block Location ...

Страница 45: ...ons A 2 Shorting the CT WARNING When you re install the meter make sure all CT connections are made BEFORE unscrewing the shorting screws See A 2 Reinstalling the Meter on page A 6 AVERTISSEMENT Lorsque vous réinstallez le compteur assurez vous que toutes les con nexions de TC transformateur de courant sont faites AVANT de dévisser les vis de court circuit Voir la section A 2 TURN SCREWS CLOCKWISE...

Страница 46: ...ower Monitoring and Smart Grid Solutions Figure A 3 MP200 Y in Enclosure Location of Fuses Current Leads Connectors Mounting Screws Mounting Screws 4 locations 855 17 1387 0 7 5 855 17 1387 0 7 5 855 17 1387 0 7 5 855 17 1387 0 7 5 855 17 1387 0 7 5 855 17 1387 0 7 5 855 17 1387 0 7 5 855 17 1387 0 7 5 03 70 81 7 02817 1 6 5 6 2 7 216 1 211 7 21 32 5 1 92 7 211 7 21 86 1 86 6 ...

Страница 47: ...cation of Fuses Current Leads Connectors Mounting Screws 4 Remove the 4 fuses from the fuse block 5 Un screw and disconnect the 48 current leads to the meter 6 Disconnect all connectors to the meter 7 Remove the 4 mounting screws securing the MP200TM to the panel 8 Remove the meter 855 17 1387 855 17 1387 855 17 1387 855 17 1387 855 17 1387 855 17 1387 855 17 1387 855 17 1387 03 70 81 7 02817 1 6 ...

Страница 48: ...ghten the 4 mounting screws 3 Insert all connectors into the appropriate sockets on the meter 4 Connect the 48 current leads to the meter making sure they are attached in the proper order 5 Install the 5 fuses in the fuse block in their proper location 6 Unscrew all shorting screws on the CT connection block See the figure below Figure A 5 Un shorting the CTs 7 Verify that no foreign material rema...

Отзывы: