F
ULL
I
NSTALLATION
I
NSTRUCTIONS
Screw mount the Pool-Smart to a wall in a dry weather proof location, ensuring that it is sited no
more than 3 metres from the swimming pool filtration pipe work and upstream i.e. before the
heating appliance.
Solvent cement the PVC T-Piece into the pipe work ensuring the direction arrow (moulded into
the T-Piece) is pointing in the direction of flow.
Electrical connection: -
To access the internal terminal connection block
Remove the 4 cover screws in the lower section of the controller housing & connect as follows:
Terminal 1 and 2 Power supply 100-230 volt ac mains
Terminal 3 and 4 connect to the filtration pump / contactor controlling the filtration pump
(volt
free switched output 2-Amp MAX)
Terminal 5 and 6 connect to the heating appliance (volt free switched output)
Terminal 7 and 8 connect to the flow switch in the T-Piece
Terminal 9 and 10 connect to the temperature sensor in the T-Piece
For programming and functionality refer to the digital controller key section
Q
UICK
S
ET
-U
P
G
UIDE
P
OSITIONING
The Pool-Smart should be installed in a dry weather proof location that will allow access to the
control buttons. Consideration must be given to the positioning of the T-Piece to ensure both the
controller and T-Piece are no more than 3 metres apart.
The T-Piece incorporates a flow switch and temperature sensor and must be sited up stream,
i.e. before, the pool heating appliance.
T-P
IECE
I
NSTALLATION
W
ALL
M
OUNTING
The rear face of the Pool-Smart has an upper key hole screw hook, located at the rear of the en-
closure, and 2 lower screw holes which are accessed after removing the 4 screws retaining the
lower access cover.
The T-Piece should be cut into the swimming pool filtration pipe work up stream (i.e. before) the
heating appliance using a suitable PVC cement. The T-Piece has slip fit female 63-mm and is
supplied with 50-mm reducers for metric countries or 1½" reducers for imperial countries.
Note:- correct orientation of the T-Piece is essential in order to facilitate the correct operation of
the flow switch, and temperature detecting probe i.e. the arrow moulded into the T-Piece must
point in the direction of flow.