![Elecro Engineering HR-110 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/elecro-engineering/hr-110/hr-110_installation-and-operating-manual_2378728022.webp)
www.elecro.co.uk
1
ENGL
IS
H
Intelligent Dosing Pump Routine Maintenance
We recommend that the dosing tube is changed every 12 months in order
to prevent any wear and tear and keep performance to an optimum. The
following steps will guide you how to replace the dosing tube:
STEP ONE
Unscrew the two screws securing the plastic cover and remove. Rotate the
grey connection caps to release the tubing.
STEP TWO
Remove the connection point on the
left hand side, and then carefully
manually rotate the cam to allow
removal of the dosing tube.
STEP THREE
Cut the two black securing ties
at either end of the tube. This will
then release the tube, which can
be discarded.
20
Содержание HR-110
Страница 1: ...H R UV C Installation Operating Manual HR 55 HRP 55 HR 110 HRP 110...
Страница 4: ...www elecro co uk 1 ENGLISH Fig 2 110W Double Tube Unit 3 Note Digital Model Shown...
Страница 7: ...2 www elecro co uk ENGLISH Washer x4 Screw x4 Raw plug x5 Fig 5 6 55W Single Tube Unit...
Страница 8: ...www elecro co uk 2 Fig 6 7 110W Double Tube Unit Washer x5 Raw plug x5 Screw x5...
Страница 13: ...2 www elecro co uk ENGLISH 12 Fig 9 LAMP LIFE INDICATOR RESET SWITCH...
Страница 30: ......
Страница 31: ......