Disclaimer: This user manual is for information only. The manufacturer reserves the right to modify any specifications.
12
Release Procedure
1.
Place load on a horizontal surface.
2.
Signal operator unlocks lifting clamps by use of the eMINI remote control.
3.
Signal operator confirms with visual inspection that all lifting clamps are
green in the LED Status Indicator.
4.
Crane operator confirms the unlocked status of the lifting clamps in the
eMAX remote control.
5.
Crane lifts and lifting clamps are released from load/cargo.
2-
1-
4 -
5 -
OK
3 - Green LED
12:42
5
ºC
1.250
Kg
USER
5
ºC
1.250
Kg
5
ºC
1.250
Kg
5
ºC
1.250
Kg
i
5.000
Kg
Содержание C5
Страница 1: ...USER MANUAL EN ...