elco TRIGON 100 Скачать руководство пользователя страница 3

General Notes, Regulations, Warranty

 

Terms and Conditions

 

General Notes

 

Installation, assembly, electrical

 

connections and initial commissioning

 

are tasks for specialized personnel

only. Said personnel shall bear full

 

responsibility for the implementation

 

of same.

 

 

Notes for Operator

 

Safety and functioning of the con-

densing boiler will be maintained if the

 

system is regularly serviced by a

 

heating specialist. The signing of a

 

maintenance agreement is recom-

mended in order to guarantee regular

 

implementation of such services.

 

State Building Ordinances

 

 

TRF

 

-

Technical Regulations for Liquid Gas

 

 

DVGW G688

 

-

Worksheet on Condensation Techno-

logy

 

 

EN 12 831

 

-

Regulations for Calculating the Hea-

ting Requirements in Buildings

 

 

EN 12 828

 

-

Safety Equipment for Heating Sys-

tems with Flow Temperatures up to

95°C

 

 

EnEV

 

 

FeuVO

 

 

 

For Austria, the following shall also

 

be applicable:

 

-

ÖVGW TR Gas (G1)

 

-

ÖVGW TR Liquid Gas (G2)

 

-

ÖNORM H 5152

 

-

Condensation Furnaces, Planning

Assistance

 

-

ÖNORM M 7443

 

-

Gas Equipment with Atmospheric

Burners, Parts 1, 3 , 5, 7

 

-

ÖNORM M 7457

 

-

Gas Equipment with Mechanically

Supported Premix Burner

 

-

ÖNORM H 5195

 

-

Hot Water Standards

 

-

ÖVGW Guidelines

 

G1 – Technical Guidelines for the

Setup of Low Pressure Gas Systems

 

G2 – Technical Guidelines for the

Setup of Liquid Gas Systems

 

G41 – Gas Condensation Furnaces,

Assembly and Connection

 

G4 – Guidelines for Furnace Rooms

 

-

Equipped is permitted pursuant to

Article 15a B

-

VG and pursuant to

Furnace System Ordinance VO (FAV

97)

 

-

Local regulations must be complied

with.

 

Prior to installation of the TRIGON

 

condensing boiler, approval by the

 

gas utility company and the district

 

chimney sweeper must be secured.

 

 

Warranty Terms, Explanations

 

We shall not assume any warranty for

 

damages resulting from the following:

 

-

unsuitable or improper use or operati-

on

 

-

faulty assembly and commissioning

by buyer or third parties

 

-

introduction of parts from outside

sources

 

-

operating system with excessive

pressure or outside of the factoryspe-

cified performance limits

 

-

use of unsuitable fuels

 

-

non

-

compliance with notes in opera-

ting manual and labels attached to

the condensing boiler

 

 

 

Regulations

 

The following standards must be

 

complied with for a safe and environ-

mentally responsible operation:

 

 

DIN 1988

 

-

Drinking Water Systems in Land Pro-

perties, Technical Regulations for

Construction and Operation

 

 

DIN 18160 + EN 13 384

 

-

Chimneys

 

 

TRGI (DVGW G600)

 

-

Technical Regulations for Gas Instal-

lations

 

 

ATV A 251

 

-

Discharge of Condensate from Fire-

places into Public Sewer Systems

 

For Switzerland also applicable:

 

-

GebäudeKlima Schweiz

 

Swiss association for heating,

 

ventilation and air conditioning

 

technology

 

-

SVGW gas guidelines G1:

 

Gas installations Swiss.

 

Association of Gas and Water

 

Professions

 

-

EKAS

-

Form, 1942:

 

Liquid Gas Guidelines, Part 2

 

-

BAFU

 

Federal Office for the Environment

 

-

VKF

 

Association of Cantonal Fire

 

Insurances

 

-

SWKI

 

Swiss Society of HVAC Engineers

 

 

In addition, state

-

specific regulati-

ons and standards must be com-

plied with.

 

 

 

 

 

 

This product conforms

 

to Directive

 

WEEE 2012/19/EU.

 

The symbol of the crossed waste paper

basket on the appliance indicates that

at the end of its working life the product

should be disposed of separately from

normal domestic household rubbish, it

must be disposed of at a waste dispo

-

sal centre with dedicated facilities for

electric and electronic appliances or

returned to the retailer when a new

replacement product is purchased.

 

The user is responsible for the disposal

of the product at the end of its life at an

appropriate waste disposal centre.

 

The waste disposal centre (which using

special treatment and recycling proces-

ses effectively dismantles and disposes

of the appliance) helps to protect the

environment by recycling the material

from which the product is made.

 

For further information about waste

disposal systems visit your local waste

disposal centre or the retailer from

which the product was purchased.

 

 

 

3

 

en

 

Содержание TRIGON 100

Страница 1: ...08 2018 Art Nr 12 060 463 B Operating Manual for authorized personnel only TRIGON L Original Operating Instructions www elco net en...

Страница 2: ...m 14 Electrical Installation 15 Commissioning Control Measures Standard boilers Pump Setting Resistance curves 16 Boiler with system separation separation for secondary cycle 17 Adjustment of Gas Fitt...

Страница 3: ...es introduction of parts from outside sources operating system with excessive pressure or outside of the factoryspe cified performance limits use of unsuitable fuels non compliance with notes in opera...

Страница 4: ...BT102 01 applies Unknown water quality and substitution systems The heating water often contains substances and additives which affect function and life cycle of the Thermo unit Therefore you should...

Страница 5: ...y demand in heat through the integrated controls Heat Exchanger The stainless steel heat exchanger is made of flat coils and provides for an exchange of heat from the exhaust to the boiler water Conde...

Страница 6: ...and therefore remain nearly constant throughout the set load range Technical Data Safety shutoff valves 2 class B C Line voltage 230 VAC Current load 0 37 A Gas pressure monitoring set to 10 mbar Gas...

Страница 7: ...s flow for natural gas g s 31 41 46 58 Exhaust temperature net TV TR 75 60 C 70 70 70 70 Exhaust temperature net TV TR 40 30 C 55 55 55 55 Gas category II2ELL3P II2H3P Exhaust value category G61 G61 G...

Страница 8: ...on Dimension Diagram 8 Air exhaust connectors parallel Air exhaust connectors concentric Connections 1 Cabel bushing 2 Flow R 11 4 3 Condensate 25 mm 4 Gas R 3 4 5 Return R 11 4 6 Expension vessel R 3...

Страница 9: ...ition The condensate is collected in a funnel and discharged into the sewer system Recommendation Accessory Neutralizing device Comply with work sheet ATV A 251 DANGER Danger of poisoning If the sipho...

Страница 10: ...nt agencies and the district chimney sweeper in charge is recommended Gas connection The layout of gas pipes and connection to the gas line must be performed by authorized gas installers only Heating...

Страница 11: ...e resistant exhaust chimney Air and exhaust venting via roof at same pressure range Floor or roof installation Exhaust and ventilation system via pitched or flat roof Air supply and exhaust venting to...

Страница 12: ...be routed through any other storage rooms If the ceiling requires a certain fire resistance duration all conduits for the combustion air supply and the exhaust ventilation must have a similar fire shi...

Страница 13: ...len bolt 1 at front panel 2 Exert slight pressure to front panel Fold front panel forward and pull up ward out of the retainer clips 3 Pull off top panel upward Remove side panels 4 5 to the bot tom r...

Страница 14: ...connections for tightness and leaks Ventilate system carefully 3 Cable passage for exterior cable 4 Gas connector 3 4 5 Flow connector 6 Return connector 7 Condensate connector 8 expension vessel plat...

Страница 15: ...the dividing plate 2 3 Power connection and connection of customer provided wiring The equipment is designed for a fixed connection and for of type NYM 3 x 1 5 mm2 or H05W F 3 x 1 mm2 Condensing boil...

Страница 16: ...boiler During inspection work the complete exchange of the system water should be avoided This can be accomplis hed through partial shutoffs or through reuse of retained and filtered system water Mini...

Страница 17: ...peed controlled pump UPM3 25 70 UPML 25 95 AUTO Pump factory setting CC3 CP1 CP1 CP2 LED dT at primary side factory setting K 20 17 18 19 Max power consumption pump W 40 80 80 110 Total max power cons...

Страница 18: ...is required After ignition the specified CO2 value at full load can be adjusted by turning the adjustment screw 2 Adjustment of the CO2 value at small load by turning the adjustment screw 1 at the gas...

Страница 19: ...ager 2 Button Domestic water use mode Domestic water use ON OFF 3 Button Set mode heating circuit Switch operating mode to Automatic mode Continuous mode at nominal level Continuous mode at reduced le...

Страница 20: ...ning Display Domestic use water temperature Domestic use water operation Display outside temperature Operating at nominal value Operating at reduced level Display flame Display error problem Display o...

Страница 21: ...ation level Further activation of the information button calls up various information available at this level Information Button Description 1 Domestic use water temperature 2 3 X Operating phase 4 Ou...

Страница 22: ...buttons are pushed during an approximate 8 min time period the system automatically reverts backs to the standard display and any changes are being saved 22 Button Display Description 1 Push the flow...

Страница 23: ...ectly to the End User level 2 Use one of the line selector buttons to advance to the respective line It is shown in display 1 as Pxxx 3 Set the desired values by using the plus or minus button The set...

Страница 24: ...24 00 hh mm Timer program HC2 Timer OFF Phase 2 16 P25 00 00 24 00 hh mm Timer program HC2 Timer ON Phase 3 17 P26 00 00 24 00 hh mm Timer program HC2 Timer OFF Phase 3 Timer Program DRW as Domestic...

Страница 25: ...tment process During the clock adjustment process each activation of resets the seconds to zero or Description of Control Valve Stop Function The control valve stop function enables a manual setting o...

Страница 26: ...be separated from the electric power lines prior to any maintenance work Gas supply and flow and return must be shut off 26 Disassembly of Boiler Panels A sealing profile is located between the front...

Страница 27: ...ng seals 6 of the bur ner plate and the ceramic fiber seal 7 must be checked for damages and must be replaced if necessary Check adjustment of electrodes 8 Cleaning of Heat Exchanger Remove burner roo...

Страница 28: ...nance shall be performed once a year The cleaning of the heat exchanger can be voided in case of minor dirt accumulation but must be performed at least every 2 years Remove combustion chamber insula t...

Страница 29: ...on notify service 2 132 Obstruction input interrupted Gas pressure monitor of external process tie in open for example 2 133 LMU automated ignition locked no recog nition of flame after safety period...

Страница 30: ...c 9 Not assigned Target values specialist level d 0 Not assigned d 1 Tsoll Target value for 2 point and modulation control valve PID d 2 TkSoll Current boiler target value d 3 TsRaum Room temperature...

Страница 31: ...92 93 93 94 At rated heat output and high temperature regime 2 4 87 7 87 8 87 8 88 0 At 30 of rated heat output and low temperature regime 1 1 98 6 98 7 98 7 98 9 Auxiliary electricity consumption At...

Страница 32: ...QAA 73 75 option External temperature sensor QAC 34 Temperature controller contribution to s 4 s 92 4 96 Class V with use of components TRIGON L Room temperature sensor QAA 73 75 option Temperature c...

Страница 33: ...0 TRIGON L 120 is in conformity with the following standards This product is designated with CE number CE 0063BQ3008 Hechingen 07 08 2018 ELCO GmbH i V Stefan Salewsky Gas Appliance Regulation 2016 42...

Страница 34: ...Service www elco net...

Отзывы: