Commissioning
Adjustment of Gas Fittings
Adjustment values for natural gas
Natural gas L / H
TRIGON L
65
-
120
Gas connection
pressure
mbar
20
CO
2
max.
%
8,8 0,2
CO
2
min.
%
8,2 0,2
Minimum and maximum CO
2
values
must always have a difference of
0.3%.
Adjustment of combustion quality
Connect equipment in terms of water,
gas, and electricity
Due to the different ignition features of
natural gas LL and natural gas E, an
adjustment of the gas/air mixture is
required.
After ignition, the specified CO
2
value
at full load can be adjusted by turning
the adjustment screw (2)
Adjustment of the CO
2
value at small
load by turning the adjustment screw
(1) at the gas fitting.
18
1
1
2
Refitting from natural gas to liquid
gas
For a refitting to an operation using
liquid gas, the following faceplates
must be used (available as a set):
TRIGON L 65:
6,0 mm
TRIGON L 85:
6,0 mm
TRIGON L 100: 6,2 mm
TRIGON L 120: 8,0 mm
Adjustment values for liquid gas
Liquid gas
TRIGON L
65
-
120
Gas connection
pressure
mbar
50
CO
2
max.
%
9,8 0,2
CO
2
min.
%
9,0 0,2
Minimum and maximum CO
2
values
must always have a difference of
0.3%.
2
en