![elco THISION L Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/elco/thision-l/thision-l_operation-and-installation-manual_2377080009.webp)
Installation
Boiler installation
Connecting the boiler
9
Boiler installation
The boiler should be positioned in a
frost-proof boiler room. If the boiler
room is on the roof, the boiler itself may
never be the highest point of the instal-
lation.
When positioning the boiler, please
note the recommended minimum clea-
rance in the picture. When the boiler is
positioned with less free space, mainte-
nance activities will be more difficult.
Connecting the boiler
This chapter will explain how to make
all connections to the boiler with regard
to:
Hydraulic connections
Condensate drain connection
Gas connection
Flue gas connection
Air intake connection
Electrical connection
The boiler should always be connected
in such a way, that the system applies
to all relevant standards and regulati-
ons (European, national and local). It’s
the responsibility of the installer to en-
sure that all standards and regulations
are respected.
Hydraulic connections (1,2,3,4)
The boiler should always be connected
in such a way, that water flow through
the boiler can be ensured at all times.
Connect the flow (1) and return (2) con-
nection of the system tension free to
the boiler connections.
The boiler contains a connection possi-
bility for an (optional) kit with safety
valve, fill/drain valve and an expansion
tank connection. The safety valve must
be connected to the flow connection (3)
of the boiler, the fill/drain valve and
expansion tank connection must be
connected to the return connection (4).
The (optional) pump kit should be
mounted directly to the return connecti-
on (2) of the boiler, before connecting
to the system.
Condensate connection (5)
After filling with water, the syphon
(included in delivery) should be in-
stalled to the connection (5) at the bot-
tom of the boiler. Connect the hose to
the draining system in the boiler room.
The connection to the draining system
should always be done with an open
connection, in order to avoid a flooding
of the boiler in case of a blocked drain.
Gas connection (6)
The gas connection must be made by
an authorized installer in accordance
with the applicable national and local
standards and regulations.
Connect the gas line from the system
tension free to the gas connection (6) of
the boiler. A gas cock should be moun-
ted directly behind the boiler.
A gas filter can be mounted directly on
the gas connection of the boiler.
1 2
5 6
3
4