elco Thision EVO WH 250-120 Скачать руководство пользователя страница 14

The Thision WH can be fed directly from the mains supply to the property without

 

the need for seperate feed cisterns or vent pipes. It is supplied complete with all its 
necessary inlet and safety controls, 

and 

thermal cut out

.

Schematic installation details  for  unvented  applications

PRESSURE REGULATING VALVE

c/w NON RETURN VALVE

T&P RELIEF

VA

L

VE

PRIMARY

FLOW &

RETURN

DRAIN COCK

(NOT  SUPPLIED)

DISCHARGE

PIPE

TUNDISH

SECONDARY RETURN

T

APPING

T O HOT

OUTLETS

MAINS

WATER

SUPP

LY

EXPANSION VA

L

VE

EXPANSION VESSEL

Thermal

cut out

Examples of acceptable discharge arrangements are;

i. Ideally below a fixed grating and above the water seal in a trapped gully.

ii. Downward discharges at low level; i.e. up to 100mm above external surfaces such
as car parks, hard standings, grassed areas etc. are acceptable providing that where
children may play or otherwise come into contact with discharges a wire cage or
similar guard is positioned to prevent contact, whilst maintaining visibility.

iii. Discharges at high level; e.g. into a metal hopper and metal downpipe with the end of the
discharge pipe is clearly visible (tundish visible or not) or onto a roof capable of withstanding high
temperature discharges of water and 3m from any plastic guttering systems that would collect such
discharges (tundish visible).

iv. Where a single pipe serves a number of discharges, such as in blocks of flats, the number served
should be limited to not more than 6 systems so that any installation discharging can be traced
reasonably easily. The single common discharge pipe should be at least one pipe size larger than the
largest individual discharge pipe (D2) to be connected. If unvented hot water storage systems are
installed where discharges from safety devices may not be apparent i.e. indwellings occupied by blind,
infirm or disabled people, consideration should be given to the installation of an electronically operated
device to warn when discharge takes place.

Note: The discharge will consist of scalding water and steam. Asphalt, roofing felt and non metallic 
rainwater goods may be damaged by such discharges.

Unvented Applications

14 

Содержание Thision EVO WH 250-120

Страница 1: ...Operation and Installation manual THISION EVO WH 08 2016 PAG THEWH01...

Страница 2: ......

Страница 3: ...0 21 Gas tightness check 21 Water heater shut down 21 Maintenance Checklist 25 Replacing the electrodes 25 Cleaning the condensate receptacle 26 Cleaning and refilling the syphon 26 Inspection of the...

Страница 4: ......

Страница 5: ...directive 2004 108 EEC EMC directive EN 483 Gas fired central heating boilers Type C boilers of nominal heat input not exceeding 70 kW EN 15420 Gas fired central heating boilers Type C boilers of nom...

Страница 6: ...utory obligations This boiler has been tested and certified to comply with all necessary European directives and is CE marked and complies with 92 42 EEC Efficiency of Hot Water Boilers Directive 90 3...

Страница 7: ...rol ling the speed of the fan As a re sult the venturi mixing system will adapt the gas ra o to the chosen fan speed in order to maintain the best possible combus on figures and therewith the best e c...

Страница 8: ...installed from the system to the unit 1 230Vac electrical supply 2 Mains cold water supply 3 DHWS secondary flow pipework 4 DHWS secondary return pipework 5 Gas supply pipework 6 Condense drain pipewo...

Страница 9: ...NOx level mg kWh 39 39 CO level max min mg kWh 99 11 88 5 Max permissible flue resistance Pa 244 134 Water volume l 6 0 9 0 Water pressure max min boiler module bar 8 1 8 1 Max water temperature High...

Страница 10: ...us output at 60 C 250L storage Continuous operation at 60 C 1st hour continous output at 60 C 500L storage 10 min peak output at 60 C 500L storage L 687 818 L 1622 2413 L 1122 1913 10 Electrical Data...

Страница 11: ...352 1 1 4 1 1 4 1 1 4 1 1 4 3 4 3 4 3 4 3 4 1 1 2 1 1 2 1 1 2 1 1 2 W 100 B1 D H1 H1 mm 1952 1821 1952 1821 11 J K L M N mm mm mm mm mm J K L M N 1100 1000 800 700 600 1100 1000 800 700 600 DHW Flow...

Страница 12: ...ons 1 2 3 4 Condensate connection 5 After filling with water the syphon included in delivery should be installed to the connection 5 at the bottom of the water heater Connect the hose to the draining...

Страница 13: ...nal regulations Construct the flue gas system as short as possible for maximum length see planner documentation Construct horizonal ways with a mini mum angle of 3 Air intake connection 8 The air inta...

Страница 14: ...taining visibility iii Discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe is clearly visible tundish visible or not or onto a roof capable of withst...

Страница 15: ...Sizing of copper discharge pipe D2 for common T P relief valve sizes Schematic discharge pipe arrangement Unvented Applications Worked example of discharge pipe sizing The example below is for a G1 2...

Страница 16: ...16 Cylinder Controls Electrical Connections...

Страница 17: ...been eliminated close the outlet Step 4 Check pipework for leaks Further Commissioning Once the system has been completely filled and vented the unit can be connected to the electrical supply All DHWS...

Страница 18: ...nal posi on Make sure the syphon is filled before star ng the boiler in order to pre vent flue gases discharging through the condensate connec on Flue and air intake connec ons Check whether the flue...

Страница 19: ...s in the display Choose set up confirm with OK button now the boiler load can be changed by rotating the wheel C and confirming the 50 setting with the OK button After checking the combustion values s...

Страница 20: ...to full load and minimum load values Make sure that the boiler is set to automa c opera on and controller stop mode is disabled a er the combus on test is finished Combus on se ngs Adjustments must be...

Страница 21: ...lt in a lockout no 28 The lockout should disappear as soon as the plug is placed back in posi on the boiler will restart Ionisa on electrode 4 Remove electrical connec on from the ionisa on electrode...

Страница 22: ...1 sensor error 65 Room temperature 2 sensor error 70 Buffer storage tank temperature 1 sensor error 71 Buffer storage tank temperature 2 sensor error 72 Buffer storage tank temperature 3 sensor error...

Страница 23: ...g temperature sensor error 324 BX same sensors 325 BX extension module same sensors 326 BX mixing group same sensors 327 Extension module same function 328 Mixing group same finction 329 Extension mod...

Страница 24: ...less header address error 353 Common flow sensor B10 not available 371 Flow temperature 3 heating circuit 3 supervision 372 Limit thermostat heating circuit 3 373 Extension module 3 error collective e...

Страница 25: ...quality of the system water as well as supply water Check the water flow rate through the boiler Check correct the combus on values at full and mimimum load with a combus on analyzer Check the gas pre...

Страница 26: ...fresh water Mount the syphon back in the original posi on Inspec on of combus on chamber For inspec on of the combus on chamber the mixing system and burner must be disassembled Switch o the boiler a...

Страница 27: ...yzer for example Test points Bolt connections Gaskets of mixing system etc Safety devices Check the functionality and the settings of all safety devices connected Consult the chapter commissioning Che...

Страница 28: ...s p m u P Safety devices a W C g n i t t e s t i m i l h g i H ter flow sensor checked d e k c e h c r o s n e s s a g e u l F C g n i t t e s r e t i m i l p m e T Min gas pressure switch setting mba...

Страница 29: ...f T lics Low velocity header Water pboiler kPa Plated heat exchanger Water flow m3 h Bypass boiler Pump setting Other Safety devices High limit setting C Water flow sensor checked Temp limiter settin...

Страница 30: ...Service ELCO UK 3 Juniper West Fenton Way Southfields Business Park Basildon Essex SS15 6SJ Tel 01268 546700...

Отзывы: