elco Polywarm-Maxi PWB-1000 Скачать руководство пользователя страница 4

Note:

 - 

BS6700

- The Design, Installation, Testing and Maintenance of Services supplying water 

for domestic use within buildings.  This document has been superseded by 

BS EN 806

 

Electrical Standards

:- BS 3456 Part 201, EN 60335 Part 1 

CP 342-2 

Code of practice for centralised hot water supply. Buildings other than individual 

dwellings.  

The Health and Safety Commission (HSC)

 approved code of practice and guidance document 

L8 - 

HSG274: 

Legionnaires disease. Technical Guidance. 

CIBSE Publications 

 

 

CIBSE Guide G 

Public Health Engineering 

 

CIBSE TM13

: Minimising the risk of Legionnaires’ disease.

 

CIBSE Guide H

 Building Control Systems.

 

CIBSE Guide

 Energy Efficiency in Buildings.

 

CIBSE

 Commissioning Code B: 2002. 

ICOM Publication - 

Water quality consideration for non domestic hot water systems 

Department of Health 

 

 

Health Technical Memorandum (HTM) 04-01: 

The control of Legionella, hygiene, ‘safe’ 

 

hot water, cold water and drinking water systems.  

 

Part A Design, installation and testing.

 

Part B Operational Management Department of Health (DH). Addendum    

 

 

 

Pseudonomas aeruginosa - advice for augmented care units.  

 

HTM 04-04

 The Control of Legionella in Health Care Premises- Code of Practice:2006 

General Requirements 

 

All connections to the local water main must comply with Water Supply (Water Fittings) 

Regulations 1999 (as amended). Compliance with the Regulations can be demonstrated by 

certification from notified body organisations such as WRAS or KIWA. 

Unvented Systems 

Building Regulations - 

use of unvented hot water storage systems with volumes exceeding 15 

litres. 

G3

 (England & Wales), 

P3

 (Scotland) & 

P2

 (Northern Ireland) 

 

The unvented system components allows the storage vessel to be fed directly from the mains 

cold water supply, or from a booster pump set, without the need for feed and expansion tanks.  

The unvented system components should be approved and comply with the Water Supply 

(Water Fittings) Regulations 1999 (as amended), including a suitably sized temperature and 

pressure (T&P) relief valve, which locates directly into the top portion of the storage vessel . 

DISPOSAL 

At the end of the technical life cycle of this product, all metal components must be 
delivered to operators authorised in the collection of metals for recycling, while all non 
metal components must be delivered to suitably authorised agents. The disposal of 
products must be managed in accordance with local regulations and must never be 
managed as household waste. 

                                                          

!

!

Page

 

4

 

of

 

25

Содержание Polywarm-Maxi PWB-1000

Страница 1: ...axi PWC Indirect Hot Water Cylinders and PWB Buffer Vessels Models PWC1 500 800 1000 1500 PWC2 500 800 1000 1500 Models PWB 500 800 1000 1500 2000 2500 3000 Page 1 of 25 Installation and Operating Ins...

Страница 2: ...h Directive 2014 68 EU PED and the Regulations 812 2013 and 814 2013 issued by Directive 2009 125 EC ErP EcoDesign Requirements for Energy Related Products and by Directive 2010 30 EC Energy Labelling...

Страница 3: ...awn to the following documents for best practice Statutory Instruments Water Supply Water Quality England Wales Regulations 2016 as amended The Public Water Supplies Scotland Regulations 2014 as amend...

Страница 4: ...onella in Health Care Premises Code of Practice 2006 General Requirements All connections to the local water main must comply with Water Supply Water Fittings Regulations 1999 as amended Compliance wi...

Страница 5: ...tation 5 Blind inspection flange 6 Primary circuit flow 7 11 4 BSP connection for magnesium anode 8 Connection for immersion heater 10 1 2 BSP tapping for instrumentation 11 Re circulation 13 T P valv...

Страница 6: ...lation Unvented models require necessary safety equipment SRV PRV Safety relief pressure reducing valve including check valve external expansion vessel tundish and a T P Temperature and Pressure relie...

Страница 7: ...ping for instrumentation 4 1 2 BSP tapping for instrumentation 11 Re circulation 5 Blind inspection flange 12 Upper coil flow 6 Primary circuit flow 13 T P valve 7 1 2 BSP tapping for instrumentation...

Страница 8: ...e use of forklift when handling and drain pipe already fitted Note 500 model Hard foam insulation applied to tank All other models Removable soft fleece insulation Unvented models require necessary sa...

Страница 9: ...2 2 3 Performance data Page 9 of 25...

Страница 10: ...g for instrumentation 8 9 1 2 BSP tapping for instrumentation 10 Connection for immersion heater 11 Re circulation 12 T P valve 13 Alternative return from external heat source source 14 Domestic hot w...

Страница 11: ...require necessary safety equipment SRV PRV Safety relief pressure reducing valve including check valve external expansion vessel tundish and a T P Temperature and Pressure relief valve These are supp...

Страница 12: ...2 3 3 Performance data Page 12 of 25 2 3 4 Unvented kits...

Страница 13: ...o filling the system After a few days of operation it is good practice to check the integrity of all joints including the tightness of the inspection flange bolts accessible by removing the cover 5 PW...

Страница 14: ...d kit is nominally sized to accommodate the capacity of the cylinder with which it was supplied plus a nominal system pipework volume of approximately 17 5 of the cylinder capacity If the system pipew...

Страница 15: ...ontrol and load circuits 15 Electrical connections for optional powered anode In areas of the country that have particularly soft water and therefore poor conductivity of the water less than 200 micro...

Страница 16: ...ontactors are suitable for the electrical load and that an earth is connected to the heater refer to Fig 14 Check that the thermostat safety cut out is correctly wired to ensure complete shutdown of t...

Страница 17: ...Page of 17 25 Figure 16 Immersion heater wiring diagrams...

Страница 18: ...axi SSC1 10 Re circulating pump 11 Hot water outlets 12 Temperature pressure relief valve 13 De Stratification pump 14 Primary heating circuit flow 15 Primary heating circuit return 16 Pressure relief...

Страница 19: ...ts 12 Temperature pressure relief valve 13 De Stratification pump 14 Primary heating circuit flow 15 Primary heating circuit return 16 Pressure relief valve 17 Immersion heater 18 Two port motorised v...

Страница 20: ...ting valve 3 Strainer 4 Pressure reducing valve 5 Expansion vessel 6 Non return valve 7 Expansion relief valve 8 Drain valve 9 Inox Maxi SSC1 10 Re circulating pump 11 Hot water outlets 12 Temperature...

Страница 21: ...k all joints for water tightness 8 Check the operation of all relief valves by manually opening the valves via the attached levers and ensuring that the discharged water clears freely via the tundish...

Страница 22: ...ur on initial opening of a hot water tap on a unvented hot water system and does not indicate a fault Page of 22 25 20 Regular Maintenance To ensure safe and continued performance of the water heater...

Страница 23: ...lways be in manual mode and its activation will be at the discretion of the user using the keypad on the control panel Electrical resistance P3 ON OFF In manual mode the user sets the temperature of t...

Страница 24: ...ary Probe 2 Range of operation 50 C 125 C Range of measurement 0 110 C 1 C T3 22 23 Primary Probe 3 Range of operation 50 C 125 C Range of measurement 0 110 C 1 C OUTPUTS P1 3 4 Primary Control 1 230...

Страница 25: ...600 Fax 01268 88250 www elco co uk This publication is issued subject to alteration or withdrawal without notice The illustrations and specifications are not binding in detail All offers and sales are...

Отзывы: