background image

All disclosures, notices and warranty conditions are being written on EKWB web page.  Please check terms of use. Revision 1.1. Released on 25

th

 of July, 2012. 

STEP 2.5: CPU Installation:  

Install the CPU in the motherboard. Refer to motherboard or CPU installation instructions. 

 

 

 

The ETI can only be applied after correct installation of the CPU. 

 

STEP 2.4: Degrease CPU lid and Water Block Surfaces: 

Saturate  a  dry  wiper  cloth  with  Indigo  Xtreme  Clean™;  use  ~1/2  trial  size  bottle  per  ETI 

installation;  thoroughly  wipe  the  CPU  lid;  repeat  with  the  water  block  interfacial  surfaces. 

Continue to wipe each surface with fresh areas of the wiper until no visible residue is detected 

on the wiper. Wipe all surfaces of any visible lint, fibers, or particulates. 

 

 

Be prepared to wipe the CPU lid and water block surfaces immediately upon saturating 

each dry wiper cloth as the Xtreme Clean™ solvent will quickly evaporate. New CPUs 

or  water  blocks  must  be  degreased  as  well.  Use  only  the  supplied  Indigo  Xtreme 

Clean™ for the degreasing step. 

 

 

 

Use the Xtreme Clean™ solvent in a well-ventilated area. Avoid contact with plastics 

(such as keyboards, computer cases, cooling fans, acetal and plexi water block 

housings, coolant tube fittings, cables, etc.). Also, avoid contact with elastomers 

(coolant tubing, gaskets, etc.). 

 

STEP 2.6: Indigo Xtreme Handling:  

The Indigo Xtreme ETI may be handled on the blue surfaces only. 

 

 

 

ETI installation requires a lint-free environment. 

 

 

Do not remove the clear Top and Bottom liners prior to the specific installation step. Do not 

bend,  flex  or  puncture  any  portion  of  the  ETI.  Keep  all  chemical  agents  (Indigo  Xtreme 

Clean™, etc.) away from the ETI. 

 

STEP 2.7: Bottom Side Liner Removal: 

Remove the “Bottom” side rectangular clear liner by slowly 

peeling the liner, beginning from the corner with the white 

BOTTOM” label. Hold the ETI on the blue edges (with both 

hands to prevent any wrinkling or warping) Do not remove 

the “Top” liner at this step. 

  

 

 

 

 

 

 

 

 

Do  not  touch  the  exposed  adhesive 

area  after  removal  of  the  clear  liner. 

Once  the  liner  has  been  removed, 

proceed  immediately  to  Step  2.8: 

Alignment and Placement.  

 

STEP 2.9: Top Side Liner Removal:  

Remove the “Top” side rectangular clear liner by slowly peeling the 

liner, beginning from the corner with the white “TOP” label. 

 

 

Do not touch any of the clear surfaces after 

removal of the clear liner. Once the liner has 

been  removed,  proceed  immediately  to  Step 

2.10: Water Block Mounting.  

 

STEP 2.8: Alignment and Placement:

  

 

 

Orientation  and  alignment  of  the  ETI  to  the  CPU  lid 

and  socket  is  critical.  Orient  the  ETI  such  that  the 

Bottom side is facing the CPU lid. Refer to the figures 

for correct placement.  

 

 

 

 

 

 

Hold the ETI on the blue edges (with both hands to 

prevent any wrinkling or warping). Ensure that the ETI is 

oriented with CPU lid/socket as shown.  

Align the square blue ring to the edge of the CPU lid 

before making contact. Carefully lower the ETI onto the 

CPU lid surface.  With moderate, downward finger 

pressure, completely press down all ETI surfaces onto 

the CPU lid by following the square blue alignment ring 

(especially the region denoted by the small red arrows). 

 

 

 

It is critical that the square blue alignment ring is completely on the CPU lid and 

all blue ring surfaces are thoroughly pressed down. 

 

 

STEP 2.10: Water Block Mounting:  

Use the following mounting instructions to ensure optimal clamping force on the ETI: 

 

 

 

  

 

It is imperative that the water block is aligned correctly before 

it makes contact with the ETI. Avoid any twisting on the ETI 

as the water block is bolted down.  

1.

 

While holding the water block in a level/horizontal position, place the springs 

onto each thumb screw. 

2.

 

Place thumb nuts on each screw and turn just enough to engage the threads. 

3.

 

Temporarily mark each thumb nut with a marking pen or tape to indicate the 

starting position (see the black markings illustrated on the top of each thumb 

nut in the image).  

4.

 

Turn  all  thumb  nuts  four  (4)  full  revolutions,  beginning  with  the  upper  left 

and right thumb nuts (as illustrated in the image). 

5.

 

Proceed to Step 3: ETI Reflow Procedure. 

 

Be  certain  thumb  nuts  have  been  tightened  only  (4)  full 

revolutions  (from  initial  thread  engagement);  DO  NOT  fully 

tighten  thumb  nuts;  excessive  clamping  force  may  damage 

ETI,  resulting  in  alloy  leakage  and/or  poor  thermal 

performance. 

Отзывы: