- 6 -
- 7 -
Install the
EK-D5 PWM G2 Motor
onto the
EK-
Quantum Inertia by following these steps
:
1. Install the provided
60x3 O-ring gasket
to the
EK-D5
PWM G2 Motor
.
2. Once the O-ring gasket is in place, take the pump and
place it into the
EK-Quantum Inertia
. You can rotate
the
EK-D5 PWM G2 Motor
if required.
3. Fix the pump onto the
EK-Quantum Inertia
using the
locking ring.
4. Take the
rubber damper
and place it into the
pump holder
.
5. Once the
rubber damper
is installed into the
pump
holder
, push the assembled part onto the
EK-D5
PWM G2 Motor
.
6. Take the M3x12 DIN7984 screws and secure the
EK-
D5 PWM G2 Motor
to the pump holder. You should
use the 2mm Allen Key. The plate with two M3 thread
holes is preinstalled by EK.
INSTALLING EK-QUANTUM
INERTIA D5 PWM D-RGB
64
34
By default, the
EK-Quantum Inertia D5 PWM D-RGB
ships with a pump holder that can be installed directly
to the computer chassis. If there are no appropriate
mounting holes available, the user may need to drill
four (4)
Ф
5 mm holes through the metal chassis with an
electric power drill.
Included is a sticker that can be
used to mark the hole centers accurately.