- 13 -
STEP 1
Screw-in two (2) EK-Pro Fitting Barb 10 mm G1-4. Attach the liquid
cooling tubes and connect the water block to the cooling loop.
EK recommends using EK fittings with all EK water blocks.
CAUTION: When using connectors other than EK fittings,
pay special attention to the length of the fittings male G1/4”
thread – 5 mm is the maximum G1/4” thread length allowed!
Inlet and outlet flow direction must be placed as shown in the picture.
FITTINGS AND TUBING
STEP 1
EK-PRO FITTING
BARB 10 mm G1-4
(2x)
IN
OUT
TESTING THE LOOP
To ensure the installation of EK components was successful, we
recommend you perform a 24-hour leak test.
When your loop is complete and filled with coolant, connect the pump
to a PSU outside your system. Do not connect power to any of the other
components. Turn on the PSU and let the pump run continuously.
Inspect all parts of the loop, and in case the coolant leaks, fix the issue
and repeat the testing process. To prevent possible damage, please
ensure that all hardware is dry before the system is powered on.
EK-Pro Fitting Barb 10mm G1/4 (2 pcs)
For this Step, you will need: