background image

All disclosures, notices and warranty conditions are being written on the back of the box.                                                                  

 

 Released on 16

th

 of November, 2010. Revision 1.0 

3.  PLACING STANDOFFS ON BLOCK. Brass standoffs  are obligatory in order  to  attach this 
water block to the printed circuit board of the graphics card. Please use the encased key to 

screw them to the copper base of the water block. 

 

 

  

 

 

 

 

 

4. ATTACHING BLOCK TO GRAPHIC CARD. By using Philips screwdriver screw in 
enclosed M3x4 screws. EKWB recommends start screwing the screws around the 

GPU core and continue outwards. 
 

 

 

STEP 4:  CHECKING FOR CONTACTS 

 

Temporarily remove the water block to check for uniform surface contact between the block and the components. Note the pattern of contact on a piece of paper. Then repeat 
substeps in previous section to reattach the block. 

In case you fail to obtain good contact, please check again your thermal pad thickness or contact our support 

service.

 

STEP 5:  SECURING I/O BRACKET

 

STEP 6:  FITTING POSITIONING

 

Use one M3x6 screw, one PVC washer and one M3 nut to secure the I/O 

(also known as PCI) bracket firmly to the circuit board. This will allow the 
computer chassis to carry the weight of the waterblock thus reducing the 
tension on the PCI-express slot. Tighten the screw with Philips screwdriver 

while holding the M3 nut with your thumbs firmly. 
 

 

Please use spacer only on copper base if you use fitting with G1/4 thread longer than 5mm (see 

sample  picture).  Screw  in  the  fittings  and  plugs  (please  use  spacers  only  on  copper  base  for 
fittings). Use 6mm Allen key to screw in and tighten new EK-Plug G1/4. Attach the liquid cooling 
tubes and connect the water-block(s) into the cooling circuit. EKWB recommends using high flow 

fittings  with  the  EK-FC  580  GTX  series  water  blocks.  To  ensure  that  the  tubes  are  securely 
attached to the barb/fittings, please use hose clamps or an appropriate substitute. The use of an 

algaecide is always recommended for any liquid cooling system.  
You can use any hole as an inlet/outlet port. 
 

 

 

STEP 6:  INSERTING CARD IN YOUR PC CASE  

Carefully lift your card with installed block and insert it in your PC case. Please bear in mind that your card suddenly withstands extra weight thus again be very careful not to 

bend it or cause any other unneeded moves that might damage your card or block during installation. 
 

REQUIRED TOOLS AND MOUNTING SCREWS: 

 

   scissors                                           

  philips screwdriver                                

  14 × screws M3x4 DIN7985           

 

 

    1 × M3x6 DIN7985                                          

      1 

×

 M3 nut                                                      

 15 

×

 PVC washers 

 

Use 10 screws M3x4 

Use 10 enclosed PVC 
washers. This way you 
will diminish possibility 
of damaging the PCB 
due to high screw 
tension. 

Fitting 

Gasket/O-ring 

G1/4 
Spacer 

Plug with o-ring 

Plug with o-ring 

6mm Allen key 

M3x6 screw 

PVC washer 

M3 nut 

Tightening the standoff: 

Отзывы: