background image

All disclosures, notices and warranty conditions are being written on the back of the box.          

 

 

 

 

          Released on 11

th

 of January, 2011. 

STEP 3:  PREPARING YOUR WATER BLOCK 

 

1.  ATTACHING  STANDOFFS.  Apply  small  amount  of  thermal  grease  around  mounting 
holes  and  place  acetal  standoffs  on  NB/SB  block  (thickness  2,1  mm)  so  the  holes  are 

concentric. Thermal paste provides enough adhesive force for standoffs to stay in a place 
for easier installation. This is a crucial step!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

2. PLACING BLOCK OVER MB. Place the motherboard on the inverted water blocks 
or vice versa and attach them with enclosed screws as shown. Make sure that 

mounting holes are aligned. Force the PCIe latch (marked blue) towards lower PCIe 
slot when installing the NB/SB part of the block. 
 

 

          

 

STEP 4:  ATTACHING BLOCK TO MOTHERBOARD 

MOUNTING THE BLOCK. For perfect thermal contact, the block does not use a spring mounting system; therefore when attaching be very careful to tighten all screws equally. 

Tightening the screws beginning in the center of the block near the northbridge, and continue evenly outwards. Do not use too much pressure on 
screws, because motherboard might bend and either cause bad contact with water block, or break a connection on the board. 

Use the enclosed screws and washers as shown in diagram below:                                                         
  

STEP 5:  CHECKING FOR CONTACTS 

 

Temporarily remove the water block to check for uniform surface contact between the block and the components. Note the pattern of contact on a piece of paper. Then repeat 

steps 3 and 4 to reattach the block. Block was tested on physical hardware. Due to height variations of chipset some differences may occur. In case you have problem with block 
contacts please write to our support mail. 

 

 

 

 

 

 

 

 

 

 

 

 

STEP 6:  POSITIONING FITTINGS AND CONNECTING TO WATER CIRCUIT 

 

Screw in fittings as shown in picture, attach the liquid cooling tubes and connect the water-block(s) into the cooling circuit. The EK-FB KIT GA P67A (UD7) series are not sold 
with high flow fittings. To ensure that the tubes are securely attached to the barb fittings, please use hose clamps or an appropriate substitute. The use of an market proved 

algaecide is always recommended for any liquid cooling system. You can use any opening as an inlet/outlet port. 

 

 

 

 

 

 

 

 

 

 
 

 

 

REQUIRED TOOLS AND MOUNTING SCREWS: 

   scissors     

 philips screwdriver           

10 screws M2.5x6 DIN7985    

  10 PVC washers 

 

 
 

Fitting 

Use M2.5x6 screws to secure the 
water block to the motherboard 

PVC washer 

Отзывы: