background image

All disclosures, notices and warranty conditions are being written on EKWB web page.  Please check terms of use.   

 

 

 Released on 18

h

 of August, 2011. 

STEP 3:  PREPARING YOUR WATER BLOCK 

 

1.  PLACING  STANDOFFS ON BLOCK. Brass standoffs  are necessary in order  to  attach 
this  water  block  to  the  printed  circuit  board  of  the  motherboard.  Please  use  the 

enclosed key to screw them to the copper base of the water block. There is no need to 
overtightening  the  standoffs  as  nickel  plating  or  threads  may  get  damaged  (also  be 
careful with handling the key not to scratch the surface).

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

2. PLACING BLOCK ON MOTHERBOARD. Place the waterblock gently to the 
motherboard or vice versa. Make sure that mounting holes are aligned. Repeat the 

same with SB heatsink. 

 

 
 

 
 

STEP 4:  ATTACHING BLOCK TO MOTHERBOARD                                          STEP 5:  CHECKING FOR CONTACTS 

 
 

Prior to fastening the screws please make sure the mounting holes on the 

motherboard’s circuit board are aligned with the waterblock and SB heatsink. Tighten 

the screws, beginning near the northbridge, and continue evenly outwards. Do not use 

excessive force when tightening the screws! 

Use the enclosed screws and washers as shown in picture below: 

 

 

Temporarily remove the water block to check for uniform surface contact between the 
block and the components. Note the pattern of contact on a piece of paper. Then 
repeat steps 3 and 4 to reattach the block applying more or less pressure to the areas 

where you have found it necessary.  
 
 
 

 

 

 

 
 
                                                                                        

6. POSITIONING FITTINGS AND CONNECTING TO WATER CIRCUIT 

 

Please use the provided 1.8mm spacer along with the gasket only if you use fitting with G1/4 thread longer than 5mm (see left picture). Attach the liquid cooling tubes and 
connect the water-block(s) into the cooling circuit. EKWB recommends using EK-PSC compression fittings with the EK-FB ASUS Crosshair V series water block. You can use any 

opening as an inlet/outlet port. 

 

       

 

 

 

 

 

 

REQUIRED TOOLS AND MOUNTING SCREWS: 

   scissors  

 philips screwdriver       

  thermal grease     

6x screws M2.5x4 DIN7985   

  6x PVC washers    

 

 

 

Standoff key 

2.1mm brass standoff  

EK-PSC fitting 

 

Tubing 

PVC washer 

M2.5x4 screw 

Waterblock  

SB heatsink  

Chip die thermal grease imprint 

Thermal pad imprints 

Отзывы: