7. ATTACHING THUMB NUTS. Place all mounting elements in same order as bellow and equally and gradually tighten thumb nuts to prevent the core from breaking .
Before moving onto next step, please make sure that spring is appropriately compressed in hole as shown on sample picture (right).
STEP 3: CHECKING FOR CONTACTS
Temporarily remove the water blocks to check for uniform surface contact between the block and the components. Note the pattern of contact on a piece of paper. Then repeat
steps 5 and 7 to reattach the block applying more or less pressure to the areas where you have found it necessary.
STEP 4: POSITIONING FITTINGS AND CONNECTING TO WATER CIRCUIT
Screw in fittings, attach the liquid cooling tubes and connect the water-block(s) into the cooling circuit. The EK-FB ASUS P7P55D KIT series are usually sold with high flow
fittings. To ensure that the tubes are securely attached to the barb fittings, please use hose clamps or an appropriate substitute. The use of an algaecide is always recommended
for any liquid cooling system.
You can use any hole as an inlet/outlet hole.
REQUIRED TOOLS AND MOUNTING SCREWS:
scissors
philips screwdriver
2 screws M3x25 DIN965
4 screws M3x6 DIN7985
Thumb
nut
Metal
washer
PVC
washer
Fittings
All
disclosures,
notices
and
warranty
conditions
are
being
written
on
the
back
of
the
box.
Released
on
15
th
of
July,
2009.