background image

7. ATTACHING THUMB NUTS. Place all mounting elements in same order as bellow and equally and gradually tighten thumb nuts to prevent the core from breaking . 

Before moving onto next step, please make sure that spring is appropriately compressed in hole as shown on sample picture (right). 

 

                 

                          

 
 
STEP 3:  CHECKING FOR CONTACTS 

Temporarily remove the water blocks to check for uniform surface contact between the block and the components. Note the pattern of contact on a piece of paper. Then repeat 

steps 5 and 7 to reattach the block applying more or less pressure to the areas where you have found it necessary. 

STEP 4:  POSITIONING FITTINGS AND CONNECTING TO WATER CIRCUIT  

Screw in fittings, attach the liquid cooling tubes and connect the water-block(s) into the cooling circuit. The EK-FB ASUS P7P55D KIT series are usually sold with high flow 

fittings. To ensure that the tubes are securely attached to the barb fittings, please use hose clamps or an appropriate substitute. The use of an algaecide is always recommended 

for any liquid cooling system. 

You can use any hole as an inlet/outlet hole. 

                             

 

 

 
 
 

REQUIRED TOOLS AND MOUNTING SCREWS: 

   scissors         

   philips screwdriver                     

    2 screws M3x25 DIN965      

4 screws M3x6 DIN7985

 

 

Thumb

 

nut

 

Metal

 

washer

 

PVC

 

washer

 

Fittings

 

 

All

 

disclosures,

 

notices

 

and

 

warranty

 

conditions

 

are

 

being

 

written

 

on

 

the

 

back

 

of

 

the

 

box.

          

 

 

 

 

          

Released

 

on

 

15

th

 

of

 

July,

 

2009.

 

Отзывы: