background image

- 11 -

TESTING THE LOOP

To make sure the installation of your EK components was successful, 
we recommend you perform a leak test for 24 hours.

When your loop is complete and filled with coolant, connect the 
pump to a PSU outside of your system. 

Do not connect power to 

any of the other components.

 Turn on the PSU and let the pump 

run continuously. It is normal for the coolant level to drop during this 
process as air collects in the reservoir.

CABLE MANAGEMENT GUIDES

The InWin 909EK also includes Cable Guides which can be used 
to manage individually sleeved cables, ensuring each wire stays 
parallel without the need to disassemble your cable.

To install them, simply pass a cable through the distribution plate 
and plug it in. Then place a guide around either side and screw it in 
place using the supplied M3x5 Countersunk screws.

Inspect all parts of the loop, and in the eventuality that coolant leaks, 
fix the issue and repeat the testing process. Ensure that all hardware is 
dry before the system is powered on in order to prevent any damage.

Содержание 3831109821848

Страница 1: ...USER GUIDE EK Quantum InWin 909EK Silver Limited...

Страница 2: ......

Страница 3: ...you start using this product please follow the basic guidelines Carefully read the manual before you begin the installation process EK fittings require only a small amount of force to screw them firml...

Страница 4: ...CONTENT TECHNICAL SPECIFICATIONS 5 ACCESSORIES 5 DISTRIBUTION PLATE CONFIGURATION 8 PUMP INSTALLATION 9 RADIATOR AND FAN INSTALLATION 10 TESTING THE LOOP 11 CABLE MANAGEMENT GUIDES 11 SUPPORT AND SER...

Страница 5: ...ength up to 250mm Motherboard Compatibility ATX Micro ATX Mini ITX and E ATX up to 277mm wide Drive Compatibility two 3 5 or 2 5 drives in the bottom chamber Maximum GPU Length 365mm Maximum GPU Width...

Страница 6: ...ild Number Plate 1x 2 InWin 909EK Chassis Accessories M3x5 2 5 HDD Screws 10x M3x6 Fan Side Panel Spare Screws 6x Black M3x6 Fan Bracket Spare Screws 2x Nickel Motherboard Stand Off 11x Motherboard St...

Страница 7: ...re installed distribution plate with an integrated cable management solution In addition there are mounting holes provisioned for up to two D5 Standalone pumps two XE 480 Radiators and eleven Vardar 1...

Страница 8: ...ted directly to the Inlet of the pump so that the impeller is always submerged during operation Failure to do so will cause permanent damage to the pump To make installation of the tubing with differe...

Страница 9: ...9 PUMP INSTALLATION D5 Standalone pumps can be installed directly to the chassis using the supplied M4x8 Countersunk screws and pre drilled mounting holes...

Страница 10: ...AND FAN INSTALLATION Radiators and Fans may be mounted onto the 3 brackets outside of the case and then installed together EK recommends the use of ZMT 10 16mm tubing for the radiators and pumps to p...

Страница 11: ...ts in the reservoir CABLE MANAGEMENT GUIDES The InWin 909EK also includes Cable Guides which can be used to manage individually sleeved cables ensuring each wire stays parallel without the need to dis...

Страница 12: ...For assistance please contact http support ekwb com EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU SUPPORT AND SERVICE...

Отзывы: