OPERATION
10
NP-DK50
DE-12_05-2015
4. OPERATION
INSTALLATION AND FIRST OPERATION
Do not use the compressor immediately after unpacking as it will not
adjust to the ambient temperature.
Only qualified personnel can install the compressor and put it into
operation for the first time. The installer shall train the operating
personnel in the use and routine maintenance of the equipment.
Installation and training of personnel should be acknowledged by the
installer‘s signature on the installation certificate.
Prior to start-up, the four screws for transport stabilization must be
removed. If the compressor is switched on without removing the
stabilizers, the compressor could be permanently damaged.
The compressor does not contain a backup power supply.
Never block the suction filter on the backside or the vent outlets on the
top of the equipment.
If the compressor is equipped with a main source of air, the standby air
source must be available.
ANY MODIFICATION OF THIS EQUIPMENT IS FORBIDDEN!
If this equipment is used nearby other instruments, the equipment must
be observed in order to verify normal operations in the configuration it
will be used.
Instruments may be affected electro-magnetically!
Removal of transport stabilizers
On the bottom of the unit are four M6
stabilizing screws that must be removed
before start-up. They are marked with a
red warning washer.
Please retain the stabilizing screws for
future transport of the compressor.
Содержание DK50 DE
Страница 1: ......
Страница 9: ...EQUIPMENT DESCRIPTION NP DK50 DE 12_05 2015 7 ...
Страница 33: ...ОПИСАНИЕ ИЗДЕЛИЯ NP DK50 DE 12_05 2015 31 ...
Страница 57: ...PRODUKTBESCHREIBUNG NP DK50 DE 12_05 2015 55 ...
Страница 80: ...POPIS VÝROBKU 78 NP DK50 DE 12_05 2015 ...
Страница 101: ...NP DK50 DE 12_05 2015 99 ...
Страница 102: ...100 NP DK50 DE 12_05 2015 ...
Страница 103: ...NP DK50 DE 12_05 2015 101 ...
Страница 104: ...NP DK50 DE 12_05 2015 112000072 000 ...