
Manufacturer: PPHU
EKOLOT
Type: KR-030 TOPAZ
Handling, Maintenance and Periodic Inspections
Manual
Issue: 1
Rev. N
o
:
Date: July 2010
Date:
Page
61
9.3.3.2 Removal of the torsion pipe T.12.124.00.00
(can be performed
after removal of the wing)
Through the inspection holes in the fuselage (Pic. 9.3.43) remove bolts
M6x15 that fix the torsion pipe to the actuator lever T.12.210.00.00. Take
the pipe out of the fuselage through the side hole.
1Pic. 9.3.44
Pic. 9.3.45
Blind rivet
Ø
4 with
steel stem 3 pcs.