
EKO INSTRUMENTS CO., LTD Grating Spectroradiometer WISER Instruction Manual Ver.2
Pg. 13
CAUTION: MS-711 requires only DC12V; however, MS-712 requires 2 system Voltage
supplies DC5V and DC12V.
CAUTION: Before switching the power on, make sure that the grid supply voltage
corresponds to the rated voltage as specified.
5 - 2 . S e t u p L o c a t i o n
1. Location
In order to obtain representative measurements from spectroradiometers, several criteria with respect to
setup and mounting of the instruments have to be considered*:
The ideal mounting position for the spectroradiometer is a location which has a full hemispheric field-of-view
without any obstructions (such as buildings, trees, and mountain). In practice, it might be difficult to find such
locations. Therefore, some practical recommendations on how to minimize undesired effects of reflecting or
obstructing surfaces are given next:
Select a mounting position which it is free from obstructions at 5
°
above horizon.
The setup location should be easily accessible for periodic maintenance (quartz dome cleaning,
desiccant replacement, etc.).
Avoid surrounding towers, poles, walls or billboards with bright colors that can reflect solar radiation
onto the spectroradiometer.
!
Figure 5-2. Parts Name and Function (Power Supply Part)
2. Connector Strip Terminal
1. Power Switch
4. Fuse Holder
3. RS232C Connecto
r
5. AC Power Supply Connector
Содержание RoMiotto MS-711
Страница 1: ...Tel 11 3976 4003 3999 7737 vendas romiotto com br www romiotto com br...
Страница 51: ......