- 10 -
To make sure the installation of EK components was successful, we
recommend you perform a leak test for 24 hours. When your loop
is complete and filled with coolant, connect the pump to a PSU
outside of your system. Do not connect power to any of the other
components. Turn on the PSU and let the pump run continuously.
It is normal for the coolant level to drop during this process as air
collects in the distribution plate. Inspect all parts of the loop, and
in the eventuality, that coolant leaks, fix the issue and repeat the
testing process. Ensure that all hardware is dry before the system is
powered on in order to prevent any damage.
TESTING THE LOOP
CONNECTING THE FLOW METER AND TEMPERATURE SENSOR
STEP 1
Plug the 6-pin connector from the water block into the marked header
on the motherboard.
STEP 1