background image

- 20 -

CONNECTING THE D-RGB LED STRIP 

STEP 1

Plug the 

3-pin connector

 of the distribution plate D-RGB LED 

light to the 

D-RGB HEADER

 on the motherboard. The LED will 

work if the pin layout on the header is as follows: 

+5V, Digital, 

Empty, Ground

.

Please ensure that the arrow indicated on the connector is 
plugged into the +5V line as indicated on your motherboard. 
If you put the LED Diode to the 12V RGB HEADER you 
can damge the LEDs. Failure to do so will damage your 
motherboard or LED strip.

STEP 1

D-RGB HEADER

RGB HEADER

To make sure the installation of EK components was successful, we 
recommend you perform a leak test for 24 hours. When your loop 
is complete and filled with coolant, connect the pump to a PSU 
outside of your system. Do not connect power to any of the other 
components. Turn on the PSU and let the pump run continuously. 
It is normal for the coolant level to drop during this process as air 
collects in the distribution plate. Inspect all parts of the loop, and 
in the eventuality that coolant leaks, fix the issue and repeat the 
testing process. Ensure that all hardware is dry before the system is 
powered on in order to prevent any damage.

TESTING THE LOOP

Содержание Momentum2 ROG Strix X570-i Gaming D-RGB

Страница 1: ...USER GUIDE MONOBLOCK EK Quantum Momentum2 ROG Maximus Z790 Hero D RGB...

Страница 2: ...disclosure and warranty conditions printed on the back of the box Beforeyoustartusingthisproduct pleasefollowthesebasicguidelines Please carefully read the manual thoroughly before beginning the insta...

Страница 3: ...HERBOARD 8 I O LIGHT COVER ASSEMBLY Z790 HERO MOTHERBOARD 11 I O LIGHT COVER ASSEMBLY Z690 HERO MOTHERBOARD 12 PREPARING THE WATER BLOCK FOR INSTALLATION 13 CUTTING AND PLACING THERMAL PADS 14 APPLYIN...

Страница 4: ...WATER BLOCK COMPATIBILITY This CPU liquid cooling unit is pre assembled for use with modern Intel desktop socket type motherboards By default out of the box this water block supports the following CP...

Страница 5: ...4 M2 5 x 12 1 pc Standoff M4 M2 x 10 5 1 pc Standoff M4 M2 5 x 12 1 pc M2 5 x 8 AX1 Screw 2 pcs 120 mm 16 mm 120 mm 16 mm EK Quantum Momentum2 Maximus XIV Hero D RGB 3831109892381 Thermal PAD F 0 5 mm...

Страница 6: ...6 WATER BLOCK DIMENSIONS CPU WB Backplate 35 7 mm 36 7 mm 64 7 mm 119 6 mm 127 4 mm 30 9 mm 20 5 mm 6 mm 78 mm 78 mm 3 5 mm 9 1 mm...

Страница 7: ...W Nickel 1 9 104677 TOP Plexi 1 10 104678 TOP Acetal Stickout 1 11 104444 Mylar sticker 1 12 8252 Screw M3 x 10 DIN7991 Inox 7 13 100500 Screw M4 x 12 4 14 8521 Standoff M4 M2 5 x 2 1 4 15 100663 EK B...

Страница 8: ...ean flat surface to work on It is recommended that you put a foam or a soft material to lay the motherboard and the water block on STEP 1 Remove three 3 screws M2 x 5 from the front of the motherboard...

Страница 9: ...ter removing the backplate unscrew the additional four 4 marked screws STEP 3 Disconnect the I O Light cable from the motherboard Pull the Heatsink straight up Put the Heatsink on a clean flat surface...

Страница 10: ...2 M2 x 4 screws Store all the screws and I O Bracket 1 for later use For this step you will need Phillips Head Screwdriver STEP 6 Turn the Heatsink upside down again and pull the I O Light screen stra...

Страница 11: ...M2x4 screws STEP 1 I O LIGHT COVER ASSEMBLY Z790 HERO MOTHERBOARD For this step you will need SCREW M2 x 2 5 SCREW M2 x 2 5 I O BRACKET 1 I O BRACKET 2 I O LIGHT SCREEN I O COVER SCREW M2 x 4 I O Ligh...

Страница 12: ...M2 M4 x 10 with M2 5 M4 x 12 from the Mounting mechanism bag STEP 1 I O LIGHT COVER ASSEMBLY Z690 HERO MOTHERBOARD For this step you will need STEP 2 Tighten the I O Bracket 1 and the I O Bracket 2 on...

Страница 13: ...TE For this step you will need Allen Key 2 5mm SCREW M2 x 2 5 I O LIGHT SCREEN I O COVER I O Light screen Screw M2 x 2 5 4pcs STEP 3 Put the I O Light onto the I O Cover and tighten it with four 4 M2...

Страница 14: ...the regulation areas Mosfet on the water block EK made sure to provide you with more than an adequate quantity of thermal pads to complete this Step Please remove the protective foil from both sides...

Страница 15: ...ire surface of the IHS The excessive or uneven application of thermal grease may lead to poor performance STEP 1 APPLYING THERMAL COMPOUND For this step you will need ATTACHING THE WATER BLOCK STEP 1...

Страница 16: ...shown in the image Do not tighten fully until all of the nuts are partially screwed in After the Backplate is tightened put three 3 M2 x 2 5 screws in the holes of the water block and tighten them EK...

Страница 17: ...arefully place the I O Light Cover onto the motherboard Align the I O Light Cover standoff holes with the holes on the motherboard STEP 4 Tighten one 1 M2 5 x 5 AX1 screw and washer to secure the I O...

Страница 18: ...d one 1 M2 x 12 mm screw from the mounting bag Tighten four 4 M2 x 10 mm screws that came with the motherboard to secure the backplate and front audio cover onto the motherboard M2 x 10 SCREW 4x M2 5...

Страница 19: ...mmends using EK fittings with all EK water blocks Do not forget to plug the remaining two openings with enclosed EK Plug G1 4 or its equivalent CAUTION When using connectors other than EK fittings pay...

Страница 20: ...EP 1 D RGB HEADER RGB HEADER To make sure the installation of EK components was successful we recommend you perform a leak test for 24 hours When your loop is complete and filled with coolant connect...

Страница 21: ...n the instructions manual This warranty does not confer rights other than those expressly set out above and does not cover any claims for consequential loss or damage This warranty is offered as an ex...

Страница 22: ...e with TECHNICAL SPECIFICATIONS AND WATER BLOCK PARTS where you can find the EAN number of each part you might need Include the EAN number with quantity in your request Mounting Mechanism EAN can be f...

Отзывы: