background image

In case you need assistance, please contact:

https://www.ekwb.com/customer-support/

EKWB d.o.o.
Pod lipami 18
1218 Komenda
Slovenia - EU

EKWaterBlocks

@EKWaterBlocks

ekwaterblocks

ekwaterblocks

EKWBofficial

SUPPORT AND SERVICE

SOCIAL MEDIA

Содержание 3831109833407

Страница 1: ...USER GUIDE 1st Revision November 25 2020 CPU WATER BLOCK EK Quantum Velocity D RGB AMD Ryzen Edition...

Страница 2: ...ad the entire manual before you start installation Please remove your motherboard from the computer to ensure the safest possible mounting process and to prevent the possibility of damage to your GPU...

Страница 3: ...RBOARDS 8 CONNECTING THE D RGB LED STRIP 11 REPLACING THE D RGB LEDs 11 TABLE OF CONTENTS BOX CONTENTS 4 REQUIRED TOOLS 5 GENERAL INFORMATION ON WATER BLOCK COMPATIBILITY 5 WATER BLOCK DIMENSIONS 6 WA...

Страница 4: ...4 BOX CONTENTS Thumb Nut 4 Thermal Grease 1 Allen Key 2 5mm 1 Standoff 4 EK Quantum Velocity D RGB AMD Ryzen Edition CPU Water Block 1 Rubber Gasket 1 Metal Backplate 1 M4 x 0 8 PA Washer 4 Spring 4...

Страница 5: ...ITY This CPU liquid cooling unit is pre assembled for use with modern AMD desktop socket type motherboards By default out of the box this water block supports the following CPU sockets AMD socket AMx...

Страница 6: ...6 WATER BLOCK DIMENSIONS 87 102 54 90 24...

Страница 7: ...ns Dimensions LxHxW 102 x 87 x 24 mm D RGB Adressable RGB Cable Length 300 mm D RGB LED Count 20 D RGB Connector Standard 3 Pin 5V Data Blocked Ground EK BADGE JET PLATE SEALING GASKET LED COVER D RGB...

Страница 8: ...o identify those parts AMD FACTORY BACKPLATE UNC 6 32 SCREWS HOLD DOWN CLAMPS STEP 1 INSTALLING THE WATER BLOCK STEP 2 Turn your motherboard face down and position the Rubber Gasket and Backplate dire...

Страница 9: ...ed STANDOFF PA WASHER STEP 3 STEP 4 Wipe the IHS clean using a non abrasive cloth or Q tip as shown in the image Once it s clean apply a line of Thermal Compound to one edge of the IHS and use a plast...

Страница 10: ...ch standoff before tightening them two revolutions at once in a cross pattern Do not tighten them fully until all of them are partially screwed in STEP 5 THUMB NUT COILED SPRING STEP 6 Tighten the fit...

Страница 11: ...ayout on the header is as follows 5V Data Empty Ground Incorrect installation or installation to the incorrect header may result in damage to the LED strip or the header itself REPLACING THE D RGB LED...

Страница 12: ...d assistance please contact https www ekwb com customer support EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU EKWaterBlocks EKWaterBlocks ekwaterblocks ekwaterblocks EKWBofficial SUPPORT AND SERVI...

Отзывы: