Operating and Maintenance Instructions
Submersible Mixer GTWS/B/I  

740/1040/1540/204/254/304

MTe12318

a1

p.

FRANZ EISELE u.SÖHNE GmbH u.Co.KG

Telefon 07571/109-0

Pumpen- und Maschinenfabrik

Telefax 07571/10988

D-72488 Sigmaringen

www.eisele.de  . [email protected]

6/8

Type 1540/204/254/304 :

5.5 Insulation measurement
Every 6 months, but at the latest after every 500 operating hours, an insulation measurement of the
connection cable is to be carried out. The sensor wire must be disconnected and the thermal contacts
connections short-circuited in order not to damage sensitive electronic components. The test voltage
must be selected so that the insulations are not destroyed.

5.6 Motor inspection
The motor compartment is to be inspected when the oil is checked. The screw plug of the inspection
opening is to be removed (03 13mm af). If fluid runs out, the mixer must no longer be operated; slight oil
leakages of the axial seal may be present. Have the mixer checked by a specialist company.
Check smooth running of the mixer, its gear and all bearings by turning.

5.7 Oil change
An oil change is to be carried out at least once a year or if used daily for long periods after every 1000
operating hours. Unscrew red screw plug (01 19mm af), release any overpressure. Unscrew oil drain
plug (02  24mm af). Ensure that the oil is thoroughly drained before filling with new oil.  The Dowty rings
necessary for sealing the plugs are to be replaced.
The air space remaining above the oil is essential and enables thermal expansion of the oil.
Oil type: conventional gear oil SAE 80-90
Oil quantity, type 740/1040 approx. 3.6 l, type 1540/204 approx. 5.6 l, type 254/304 approx. 4,6 l

Oil level

01

02

03

Содержание GTWS 740

Страница 1: ...ory prior to start up Contents 1 Description and applications 2 Transportation and storage regulations 3 Electrical connection 4 Start up 5 Maintenance and inspection 6 Repairs 7 Troubleshooting 8 Safety information 1 Description and applications Max submersion depth 40 m Medium chemically neutral Max temperature 65 C Ensure sufficiently free flowing consistency dilute if necessary EISELE mixers h...

Страница 2: ...st also be observed The control switch is to be made weather proof in the operating and visible area of the mixer If this is not the case an EMERGENCY STOP switch must be provided by the customer in this area The regulations of VDE 0113 or other existing regulations are to be observed 3 1 Neutral wire The neutral wire must be routed to the switch or control system 5 core wires must be used for ext...

Страница 3: ...e shut down is ensured in the event of overheating i e the thermal contacts installed in the submersible motor must be looped with the control power circuit The thermal contacts are designed as normally closed standard 230V AC 1 6Amax 3 7 Unit cable To mount a control switch the mixer should be lowered completely due to the length of cable available Only original cable or line terminals may be use...

Страница 4: ...en if the retaining bolts work loose 4 5 Attention When moving the mixer pay attention to the connection cable The wire cable must always be taut With a loose wire cable the mixer could suddenly swing against the cable and damage it Do not operate the mixer half submerged Vibrations on the mixer and walls are too great Operation is only permitted when the mixer is covered with at least 0 6 m of fl...

Страница 5: ... checked for fibrous fractures pinches and other damage along the complete length 5 4 Checking the gearbox oil The oil should be checked every 6 months or after 500 operating hours at the latest To do this unscrew the red screw plug 01 19mm af and insert a thin object diagonally downwards in order to remove a sample of oil from the bottom area If the oil contains too much foreign fluid it will hav...

Страница 6: ...en the oil is checked The screw plug of the inspection opening is to be removed 03 13mm af If fluid runs out the mixer must no longer be operated slight oil leakages of the axial seal may be present Have the mixer checked by a specialist company Check smooth running of the mixer its gear and all bearings by turning 5 7 Oil change An oil change is to be carried out at least once a year or if used d...

Страница 7: ...red with suitable measures 6 Repairs Repairs beyond those mentioned above may only be carried out in the Eisele factory or in a specialist workshop authorised by us 6 1 Bearings The bearings are to be completely replaced at the latest after 11000 operating hours 6 2 Mechanical seals The mechanical seals are to be replaced at the latest after every 3000 operating hours or after 2 years Mechanical s...

Страница 8: ... disconnected from the power supply and protected against being switched on again The windings are to be discharged all wires disconnected and short circuited Electrostatic charges and mechanical sparks must always be avoided 8 1 The applicable regulations concerning industrial safety plant design and electrical connection e g specifications of professional associations VDE German EngineeringAssoc...

Отзывы: