4.3 Direction of rotation
Select the “thrust“ direction. The propeller should rotate anti-clockwise (GTWS740/1040) as you
look at it from the frontside of the propeller, clockwise at GTWS 1540/204/254/304.
The original EISELE switch has a phase inverter. If the propeller rotates in the wrong direction, press
the screwdriver into the slot in the plug and rotate the contacts by 180° until the phase
inverter is re-engaged.

4.4 Checks
If there are no obstacles in the tank, can the mixer make contact anywhere?
Does the mixer also turn (two-phase cycle or blockage)? Switch off immediately and do not wait until
thermal contacts are triggered!
All screws and connections are to be checked for tight fit. These checks are to be repeated at regular
intervals.
The wire cable /plastic cable must not rub or jam anywhere.
The anti-rotation device must be secured with additional limit stops in such a way that the propeller
does not make contact even if the retaining bolts work loose.

4.5 Attention
When moving the mixer, pay attention to the connection cable.
The wire cable must always be taut. With a loose wire cable, the mixer could suddenly swing against
the cable and damage it.
Do not operate the mixer half submerged. Vibrations on the mixer and walls are too great.
Operation is only permitted when the mixer is covered with at least 0.6 m of fluid.
If oscillations and vibrations beyond the normal amount occur during operation, the unit is to be shut
down immediately and inspected. This also applies to all fastenings, connections and cable clamps.

5. Maintenance and inspection
All maintenance and inspection work etc. may only be carried out when the electrical system is to be
disconnected and protected against being switched on again.
During all inspection and maintenance work, no explosive atmosphere may exist.
Maintenance and service work may only be carried out by qualified, experienced personnel.

5.1 Cleaning
The mixer is to be regularly cleaned of external encrustation and blockages.
If corrosion becomes visible, it must be rectified by suitable means.

5.2 Check connection cable and fastenings
The motor cable is to be checked at regular, short intervals for bends and pinches as well as for
damage.
The cable protection system (protective tube, cable clamps) is also to be checked for damage, pinches,
moved or loose clamps etc.

Содержание GTWS 740

Страница 1: ...ory prior to start up Contents 1 Description and applications 2 Transportation and storage regulations 3 Electrical connection 4 Start up 5 Maintenance and inspection 6 Repairs 7 Troubleshooting 8 Safety information 1 Description and applications Max submersion depth 40 m Medium chemically neutral Max temperature 65 C Ensure sufficiently free flowing consistency dilute if necessary EISELE mixers h...

Страница 2: ...st also be observed The control switch is to be made weather proof in the operating and visible area of the mixer If this is not the case an EMERGENCY STOP switch must be provided by the customer in this area The regulations of VDE 0113 or other existing regulations are to be observed 3 1 Neutral wire The neutral wire must be routed to the switch or control system 5 core wires must be used for ext...

Страница 3: ...e shut down is ensured in the event of overheating i e the thermal contacts installed in the submersible motor must be looped with the control power circuit The thermal contacts are designed as normally closed standard 230V AC 1 6Amax 3 7 Unit cable To mount a control switch the mixer should be lowered completely due to the length of cable available Only original cable or line terminals may be use...

Страница 4: ...en if the retaining bolts work loose 4 5 Attention When moving the mixer pay attention to the connection cable The wire cable must always be taut With a loose wire cable the mixer could suddenly swing against the cable and damage it Do not operate the mixer half submerged Vibrations on the mixer and walls are too great Operation is only permitted when the mixer is covered with at least 0 6 m of fl...

Страница 5: ... checked for fibrous fractures pinches and other damage along the complete length 5 4 Checking the gearbox oil The oil should be checked every 6 months or after 500 operating hours at the latest To do this unscrew the red screw plug 01 19mm af and insert a thin object diagonally downwards in order to remove a sample of oil from the bottom area If the oil contains too much foreign fluid it will hav...

Страница 6: ...en the oil is checked The screw plug of the inspection opening is to be removed 03 13mm af If fluid runs out the mixer must no longer be operated slight oil leakages of the axial seal may be present Have the mixer checked by a specialist company Check smooth running of the mixer its gear and all bearings by turning 5 7 Oil change An oil change is to be carried out at least once a year or if used d...

Страница 7: ...red with suitable measures 6 Repairs Repairs beyond those mentioned above may only be carried out in the Eisele factory or in a specialist workshop authorised by us 6 1 Bearings The bearings are to be completely replaced at the latest after 11000 operating hours 6 2 Mechanical seals The mechanical seals are to be replaced at the latest after every 3000 operating hours or after 2 years Mechanical s...

Страница 8: ... disconnected from the power supply and protected against being switched on again The windings are to be discharged all wires disconnected and short circuited Electrostatic charges and mechanical sparks must always be avoided 8 1 The applicable regulations concerning industrial safety plant design and electrical connection e g specifications of professional associations VDE German EngineeringAssoc...

Отзывы: