![Eisco CH0814 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/eisco/ch0814/ch0814_instruction-manual_2372679004.webp)
PH/BSSS
PHB/B4
PHC/B4
PH/H/3KW
PH/HK
PH/GK
Order No. for spares
1
1
1
1
1
1
Quantity
Component
S.S. Stand with 2 stainless steel boiler
straps with springs (Part 1 & 11)
Glass Boiler (Part No. 2)
Glass Condenser (Part No. 3)
Metal Heater (Part No. 4)
Hose Kit (Part No. 12, 13, 14)
Gasket Kit (Part No. 5, 6, 7, 8, 9, 10)
CHECK FOR THE FOLLOWING SERVICES
*
Single phase electric supply capable of handling a load of 3KW, 230V
± 10%, 50 Cycles and with a fuse carrier of 13 amps. Supplies should
be fitted with a 30mA RCD circuit breaker.
*
A conventional 13 amps plug and socket, wall mounted is
recommended.
*
The equipment must be earthed in all cases. Red - Live, Black-
Neutral and Green - Earth.
*
Cooling water supply for Glass Condenser (Part No. 3) capable of
providing minimum flow rate of 60 ltrs/hr. The flow rate has to be
adjusted by the lab technician using a measuring cylinder or using a
flow meter. All water supplies should be earth bonded.
*
A drain located below the level of the still so that the PVC Drain pipe
(Part No. 12) from the Glass Boiler (Part No.2) can fall straight without
kinks or bends to allow unimpeded flow of water. Ensure all drainage
systems are earth bonded.
*
Reservoir :- A distillate collection reservoir should be below the output
of still.
INSTALLATION
1.
Open the box carefully and identify the following components:
2.
Place the S.S. Stand (Part No. 1) at a suitable location, bench top ro
wall mounted using the two key holes provided.
-3-
© EISCO SCIENTIFIC
●
www.eiscolabs.com