
Page 5 of 16
Drawing : - TPC575
Issue
: - 1
Date
: - 08/02/22
SYSTEM INSALLATION
WIRING
Connect a suitably fused 460V 60Hz 3 phase mains power supply to the
MAINS T/B terminal block inside the electrical box located at the control panel
end of the machine.
DRAINAGE
The appliance is fitted with a condensate pump which collects all the
condensate. As the condensate pump fills with water it will automatically
activate and empty via the tube outlet located underneath the dehumidifier,
this should be connected to a water container or permanent drain. NOTE:
after the pump has emptied there will still be a small amount of water standing
in the pump reservoir which will leak if the dehumidifier is not kept upright.
POSITIONING
The CD425 is designed for indoor use only.
Position the dehumidifier unit in the centre of the room to be conditioned if at
all possible. Using a spirit level ensure the unit is level in both directions.
Failure to do so may result in the drain tray overflowing and flooding of the
chamber.
NOTE: Both inlet grille and outlet grille of the dehumidifier unit must have
clear space around them and not be obstructed in anyway.
Minimum installation requirements.
A gap of at least 1000mm is required above the dehumidifier.
AIR IN
AIR IN
AIR OUT
400mm
400mm
250mm
250mm