4. Technical data
Engine type:
4-stroke engine; air-cooled
Max. engine output:
4.8 kW / 6.5 bhp
Displacement: 196
cc
Idle speed of engine:
1500 rpm
Maximum engine speed:
3600 rpm
Fuel:
Regular unleaded petrol
Tank capacity:
3.6 l
Oil volume / type:
600 m
L SAE#30
Spark plug:
L7TC
Max. intake head:
6 m
Max. pumping rate:
35000 l/h
Max. delivery head:
26 m
Max. pressure:
2.6 bar
Weight (with empty tank):
28 kg
Intake/Discharge connector:
2” hose connection
2” / 1.25“/ 1” thread connector
L
WA
sound power level:
95 dB
L
pA
sound pressure level:
75 dB
5. Before starting
As a basic principle, we recommend the use of a
preliminary filter and a suction set with suction hose,
suction strainer and non-return valve, in order to
prevent long priming periods and unnecessary
damage to the pump as a result of stones and solid
foreign bodies.
5.1 Preparing the machine
앬
Fill the engine with engine oil (see also point
7.2.1 Oil change).
앬
Fill the tank with petrol.
앬
Place the machine on a flat, firm surface.
5.2 Connecting and routing the intake and
discharge lines
앬
Connect the intake line to the intake connection
(Figure 3 / Item 11) and the discharge line to the
discharge connection (Figure 3 / Item 3).
앬
Position the intake line so that it rises from the
water withdrawal point to the pump. It is essential
that you do not route the intake line above the
height of the pump. Air bubbles in the intake line
will slow down and prevent the intake process.
앬
Install the intake and discharge lines in such a
way that they do not exert any mechanical
pressure on the pump.
앬
The intake valve should be low enough in the
water to ensure that if the water level falls, the
pump will not run dry.
앬
A leaking intake line will draw in air and therefore
not draw in any water.
앬
Do not draw in any foreign bodies (sand, etc.). If
necessary install an initial filter.
6. Operation
The pump must be filled with the transport fluid at the
filler neck (Figure 3 / Item 2) before the engine is
started.
Note: We advise that you install a non-return valve in
the intake line and fill it with water before you start
the machine for the first time.
6.1 Starting the engine
1.
Set the On/Off switch (Figure 1 / Item 6) to “ON”.
2.
Set the petrol cock (Figure 4 / Item 8) to the “ON”
position.
3.
If the engine is cold, set the choke lever (Figure
4 / Item 9) to “Choke”.
4.
Move the throttle lever (Figure 4 / Item 10) to the
center position.
5.
Pull the starter cord (Figure 4 / Item 7) until the
engine starts.
6.
When the engine has been running for approx.
30 seconds, move the choke lever to “Run”.
If the engine is warm, leave the choke lever in the
“Run” position when starting.
Explanation of the positions of the throttle lever
(Figure 4 / Item 10):
“Tortoise”:
Engine in idling
“Hare”:
Maximum delivery rate
8
GB
Anleitung_BG_PW_48_SPK1:_ 25.06.2008 9:34 Uhr Seite 14