37 of 73
4-12 Ballast & DC-DC Board & AC Filter Board & Power Board & Fan 8 & Fan 9
Loosen 4 screws on the ballast module
cover and then take off it. (Torque: 50~60
Nm)
Unplug 3 connectors and Loosen 4 screws on
ballast. Then, take off it. (Torque: 50~60 Nm)
Unplug 3 connectors and Loosen 4 screws
on ballast. Then, take off it. (Torque: 50~60
Nm)
Take out the two ballasts.
Loosen 3 screws and unplug 4 connectors
on the power module and DC-DC Board.
(Torque: 50~60 Nm)
Unplug 1 connector and 2 group cables fasten
tie on the power module and DC-DC Board.
Содержание EIP-UJT100
Страница 1: ...1 of 73 PROJECTOR Service Manual EIP UJT100 Rev 00 ...
Страница 2: ...2 of 73 DLP DIGITAL PROJECTOR rev 00 Revision Description Date Rev 00 Preliminary 5 13 2015 ...
Страница 6: ...6 of 73 2 2 Block Diagram EIP UJT100 ALL Boards Function Block Diagram ...
Страница 8: ...8 of 73 ...
Страница 9: ...9 of 73 3 TROUBLESHOOTING 3 1 Control Keys and LED Indicators ...
Страница 60: ...60 of 73 6 3 Replacing the Lamp ...
Страница 61: ...61 of 73 ...
Страница 62: ...62 of 73 ...
Страница 63: ...63 of 73 6 4 Replacing the Filter ...
Страница 64: ...64 of 73 Replacement Filter Side Rear 3243270701 Replacement Filter Front 3243411700 ...
Страница 70: ...70 of 73 No 46 No 47 No 48 No 49 No 50 No 51 No 52 No 53 No 54 No 55 No 56 No 57 No 58 No 59 No 60 ...
Страница 71: ...71 of 73 APPENDIX TIMING TABLE ...
Страница 72: ...72 of 73 ...
Страница 73: ...73 of 73 ...