CONTENTS
GENERAL
Service Assistance
1
Initial Inspection
1
10 and 12 Meter Operation
1
SECTION 1
Introduction
2
General Description
2
Specifications
2
SECTION 2
Preparation for Operation
3
Transformer Installation
3
Shipping Hardware Removal
3
120 Volt Modification
4
Transformer Installation - Pictorial
5
SECTION 3
Transceiver Connection
6
Transceiver Connection - Pictorial
7
SECTION
4
Operation
8
Control Functions
8
Switches
8
Metering
8
Tune-Up Procedure
8
High and Low Power Tune-Up
10
Reflected Power Protection
11
ALC
11
Initial Control Settings - Table 1
12
SECTION 5
Operating Notes
13
Panel Lamp Replacement
14
SECTION
6
Troubleshooting Tips
15
Receive Fuse Replacement
17
SECTION 7
Theory of Operation
18
SECTION 8
Schematics
23
#
t