InTRODuCTIOn
Please read and follow the installation and operating instructions
carefully, to ensure the long life and reliable operation of this
appliance.
The Electric Heating Company may make minor changes
if necessary in the appliance that will not be shown in the
operating instructions, so long as the main features of the boiler
remain the same.
All boilers come with a 24 month warranty that covers all
defects originating from faulty materials and workmanship in the
manufacture of the boilers.
The warranty covers the replacement of any faulty parts and
labour costs.
The warranty will not cover any damage to the boiler from poor
or incorrect installation work.
The warranty will not cover any call out charges that have not
been organised by the Electric Heating Company Ltd.
The warranty will not cover water leaks into the boiler. All
plumbing joints must be checked.
The warranty card must be completed and sent back to The
Electric Heating Company as soon as possible for registration.
An internal Magnetic Filter is fitted to the Boiler and it must be
cleaned at least annually. (Note: Failure to clean the Magnetic
Filter may result in boiler shutdown). Warranty calls will not be
covered for this repair.
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning
use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
Page Contents
INTRODUCTION
2
PREPARATION
3
INSTALLATION
4
INSTALLATION ELECTRIC BOILER INTERNAL LAYOUT
5
COMMISSIONING
6
INSTALLATION
7
ELECTRICAL CONNECTIONS AND CONTROLS
10
EXTERNAL CONTROL WIRING
12
CONTROL PANNEL CONNECTIONS
14
POWER BOARD - CONNECTION 415V 3N~ 39kW
15
POWER BOARD - CONNECTION 415V 3N~ 14,4 -23 kW 16
POWER BOARD - CONNECTION 240V 4-14.4kW
17
EXTERNAL BOILER WIRING
18
BOILER DIMENSIONS
18
USER INSTRUCTIONS
19
FAULT FINDING
21
TECHNICAL SPECIFICATIONS
22
Содержание Fusion Comet EHCCOM12KW
Страница 8: ...8 GB 031C_f Temporary Filling Loop Mains Water Supply INSTALLATION Figure 4 ...
Страница 9: ...9 GB 031C_f Figure 5 Temporary Filling Loop Mains Water Supply ...
Страница 18: ...18 GB 031C_f EXTERNAL BOILER WIRING BOILER DIMENSIONS Figure 11 Figure 12 Return Inlet Flow Outlet 710 ...
Страница 23: ...23 GB 031C_f ...