background image

7

MAXIMUM AVAILABLE POWER

Note:

 Installation of this device must be carried out by a competent electrician in 

accordance with I.E.E. Regulations for Electrical Equipment. BS:7671

Power Meter

The Power Meter is a device that monitors and helps to protect the main power 

supply to the property. From a Computer, Smart phone or Tablet you are able to 

access and view your total home or heating systems electrical consumption at any 

given time.

Installation of Power Meter

The power meter should be connected to a spare 6 amp Mcb or Rcbo within the properties Consumer 

Unit. This supply should then be taken and connected to a fused switched spur with a minimum 

contact of 3mm and fuse rated to 3amps. From the fused spur take a supply cable to the Power 

Meter that should be mounted within a mini enclosure. Live and Neutral connections are cleatly 

marked at the bottom of the device.
(Take care not to damage the Terminals when connecting the power cable to the Meter)

Typical Layout:

TEST

6

3A

FUSE

Consumer Unit

Main Cable to Property

Earth not shown for clarity

Fused Spur

Mini Enclosure

Содержание eco SAVE

Страница 1: ... Instructions NOTE A qualified electrician must carry out the installation of the Power Meter The Electrical installation must comply with the current UK regulations to BS 7671 Any claim on the warranty could be invalid if these requirements have not been met ...

Страница 2: ...art Phone Tablet or Computer when connected to the Internet The SmatHome system has the capacity to monitor and restrict the maximum power load that can be drawn from the heating system at any given time protecting the overall power loading of the proprerty INDEX INTRODUCTION 2 REQUIREMENTS 3 SETUP 4 PAIRING 5 LOAD SHEDDING 6 POWER METER 7 TECHNICAL 9 NOTES 10 ...

Страница 3: ...omes supplied with a Micro USB Power Cable and 230 volt power adapter Note The DHCP server within the router must be activated there must be a direct Internet connection without passing through a proxy Output ports 123 UDP 3000 TCP must be open Check with Router Manufacturer The Power Meter must be only be installed by a qualified electrician in accordance to I E E regulations BS 7671 Getting Star...

Страница 4: ...s first connected the device will try to communicate and link with the server you will see a sequence of LED s blinking on the gateway Gateway LED Status Green off Orange flashing one second discovery status device pairing Orange on Green flashing 0 2 seconds the router has not assigned an IP address to the gateway Orange on Green flashing briefly every 5 seconds the router has assigned an IP addr...

Страница 5: ... Devices then click on the Add icon this will also put the eco SAVE Gateway into pairing mode An Orange LED on the Gateway will start to flash You have 1 minute to add a device at this stage For each additional new device that is added the available time increases as you go through the pairing process Pairing a Heater with Gateway When the Gateway is in pairing mode Simply press and hold the OK bu...

Страница 6: ...cept to save Priority The Radiators are set with No Priority by default If you require to prioritise Radiators you can select priority levels between 1 30 The priority of each Radiator depends on 3 factors 1 Temperature difference between the set point and the environment 2 The value of the priority assigned to each Radiator By default all Radiators start with no priority level 3 If a Radiator is ...

Страница 7: ...stallation of Power Meter The power meter should be connected to a spare 6 amp Mcb or Rcbo within the properties Consumer Unit This supply should then be taken and connected to a fused switched spur with a minimum contact of 3mm and fuse rated to 3amps From the fused spur take a supply cable to the Power Meter that should be mounted within a mini enclosure Live and Neutral connections are cleatly ...

Страница 8: ...isplay 5 The Power Meter is now Paired Setting Maximum Power You can set the maximum overall power that can be drawn from your property by selecting 1 Devices 2 Electricity Meter 3 Edit 4 Now set the maximum level OK to save from Desktop Computers and Accept from Smart Phones Tablets Status of the Power Meter LED Not paired LED off Paired correctly the LED flashes once every two and a half seconds...

Страница 9: ...r Supply 200 260 V 50 Hz Consumption 0 90W Communication Frequency 868MHz Measurement CAT II Voltage and Current up to 80A AC Instantaneous Active Power Accumulated Active Energy Error 3 Operating Temperature 0 ºC to 60 ºC Storage Temperature 20 ºC to 85 ºC Impact Strength IK06 Clamp Sensor External current transformer with measurement range between 0 and 100A AC Connection with 3 5 mm jack Cable ...

Страница 10: ...10 INSTALLATION NOTES ...

Страница 11: ...11 INSTALLATION NOTES ...

Страница 12: ...e recycling Business users should contact their supplier and check the terms and conditions of the purchase contract This product should not be mixed with other commercial wastes for disposal of the purchase contract the electric heating company Block 5 Unit 40 Third Road Blantyre Industrial Estate Blantyre G72 0UP United Kingdom TEL 01698 820533 info electric heatingcompany co uk www electric hea...

Отзывы: