background image

 

 

DO70008Rev1 

 
 
 
 
 

 

 

 

 

 

 
 

 

 

Evolve Hub A 

Installation Manual 

For use with the Evolve ESS & Evolve LFP energy storage systems  

 

 

Содержание Evolve Hub A

Страница 1: ...DO70008Rev1 Evolve Hub A Installation Manual For use with the Evolve ESS Evolve LFP energy storage systems ...

Страница 2: ...low path for active cooling Never operate system in a manner not described by this manual Only qualified personnel should service this product Ensure cover is securely fastened after installation is complete Do not attempt to operate this product if there is any physical evidence of damage to the enclosure or internal components CAUTION This product contains an AGM lead acid battery This product m...

Страница 3: ...BLE CONNECTION 9 4 2 AK1 CABLE CONNECTION 9 4 3 AC POWER CONNECTIONS 10 4 3 1 Phase Orientation in Split Phase 120 240 Systems 10 4 3 2 Main Electrical Panel Connection 11 4 3 3 Backup Panel Connection 11 4 3 4 Evolve battery system PCS Grid Port Connection 11 4 3 5 Evolve battery sytem PCS Load Port Connection 11 4 4 CT CONNECTIONS 12 4 4 1 Main Electrical Panel CT Connections 12 4 4 2 Solar PV C...

Страница 4: ...ripheral intended to be operated with the Evolve energy storage system including models Evolve ESS and Evolve LFP Refer to the Installation Startup Manual relevant to the battery system installation as ordered A complete list of Installer resources is available at www eguanatech com under the Evolve product banner 1 2 Glossary 1 3 Initial Inspection of Material List The system components supplied ...

Страница 5: ...ESS Grid Load transfer circuit when the grid is live and the battery system is in service normal operation The EMC commands the battery system to charge or discharge the battery as demanded by the energy management algorithm In a self consumption algorithm for example the EMC calculates the difference in total load vs solar PV and routes the balance of power to from the battery as needed When the ...

Страница 6: ...rohibits PV power export to the grid For non export applications consult your Eguana dealer for alternate EMS panel solutions 1 5 4 Circuit and system sizing for 100 125 150 Amp electrical panels Line side tapping the main electrical panel is required for ESS installations where the electrical service rating is under 200 Amp Refer to section 2 3 figure 11 1 5 5 Circuit and system sizing for 200 Am...

Страница 7: ...functions Commands the battery system to charge and discharge as defined by the selected control algorithm Monitors the home loads solar PV and battery power via on board 8 channel power meter Provides the Internet gateway to customer supplied internet router via wired Ethernet wi fi or cellular A 12V AGM UPS backup battery supplies uninterrupted power to the EMC Figure 7 EMC feature overview E Ge...

Страница 8: ... or death NOTE Communication cables between the Evolve Hub and the battery system are limited in length The Evolve Hub should be installed within 2 ft of the battery system CAUTION Do not install in direct sunlight 2 1 Installation clearances between the Evolve Hub and the battery system The Evolve Hub includes a 10 foot communication cable that connects the hub to the battery system If the instal...

Страница 9: ... CAT 5 6 STP S2 x2 CT 50 Amp 8 ft pigtail 18 2 300V 1 S3 AK1 Hub Control Signal cable harness included 10 ft 18 2 300V S4 x2 CT 200 Amp 8ft pigtail 18 2 300V 1 S5 CT 50 Amp 8 ft pigtail 18 2 300V 1 Note 1 Conductor type referenced where Hub is installed greater than 24 from the Evolve ESS Signal wiring routed in conduit with power must be 300V rated For runs longer than 10 meters signal separation...

Страница 10: ...ght or dedicated disconnects a separate disconnect must be used for each of the grid and load ports The disconnects and or circuit breakers must operate independently of each other and rated for the branch circuit 4 CTs are equipped with 8 ft pigtails Twisted pair extensions can be run up to 30 ft CT extensions should not be required if Evolve Hub is within 4 ft of Evolve system 5 Ethernet connect...

Страница 11: ...rrent protection is installed and sized appropriately for the AC circuits in accordance with the National Electrical Code ANSI NFPA 70 Canadian Electrical Code and local codes The patch cables provided in section 4 1 and 4 2 below have pre assembled connectors at both ends It is strongly recommended that these cables are pulled in conduit prior to the power cables CAUTION Do not install cables if ...

Страница 12: ... and transfer switch Each port must be connected to electrically isolated panels Tapping line or neutral wires from the main electrical panel to the backup panel will result in permanent damage to the product 4 3 1 Phase Orientation in Split Phase 120 240 Systems The EMC derives power measurement at the main service the solar PV inverter AC output and the ESS Consistent phase voltage orientation t...

Страница 13: ... battery system PCS Grid Port Connection Route AC_Grid_PCS L1 L2 Neutral and Ground to the PCS Grid port inside the Evolve ESS LFP 4 3 5 Evolve battery sytem PCS Load Port Connection Route AC_Load_PCS L1 L2 and Neutral to the PCS Load port inside the Evolve ESS LFP L1 L2 N To main panel GND L1 L2 N To backup panel GND PCS L2 L1 N GND PCS L2 L1 N Figure 19 Evolve Hub to PCS grid port connection Fig...

Страница 14: ... Terminate CT5 at the L1 input of the solar circuit within the backup electrical panel 4 4 3 Evolve PCS CT Connections CT direction faces into the Evolve ESS LFP Current measurement is positive when battery is charging and negative when discharging 1 Terminate CT7 at the X1 power wire of the Evolve PCS 2 Terminate CT8 at the X2 power wire of the Evolve PCS 4 5 12V Backup Battery Connection IMPORTA...

Страница 15: ... Guide for instructions on startup turning on DC source only If AC disconnects or the optional breaker kit has been installed between the PCS grid load ports and the battery system leave them in the OFF position until the power up of the hub has been completed 1 Turn ON the Evolve Hub breaker in the main panel Powering up the Evolve Hub will supply power to the on board EMC The red and green light...

Страница 16: ...n is recommended to ensure the enclosure maintains mechanical integrity mounting and environmental protection and the ventilators are free from obstruction For heavy soiling use a soft dry brush to clean Do not use any solvents scouring or corrosive materials to clean the unit Never remove or unplug connections or plugs during cleaning 7 Troubleshooting The following is a troubleshooting guide for...

Страница 17: ...urrent and duration short circuit 14 0 Apk 2 5 Arms duration 63 5 ms AC connections number type 4 Grid Load PCS Grid PCS Load AC voltage operating range Max 100 to 264 Vac Note UL 1741SA compliant operating limits are determined by the Evolve ACB05U LP configuration settings AC frequency operating range Max 47 to 63 Hz Note UL1741SA compliant operating limits are determined by the ACB05U LP config...

Страница 18: ...es A1 801003652 Voltage Sense Cable 120VAC L1 to N power meter reference B1 801003644 Backup Battery Cable 12V AGM battery power B2 801003650 EMS A 12V 24V Power Cable 12V UPS power for EMC B3 801003650 EMS A 12V 24V Power Cable 24V Power supply for EMC C1 801003658 Comm Cable EMC to PCS internal communication patch cable Figure 24 Electrical block diagram internal components ...

Страница 19: ...l with or without an operating Evolve ESS LFP system When standalone the Kx relay bypasses the energy storage system to power the backup panel from the main supply It remains in the NC or bypass state until powered up with the Evolve ESS LFP initialized and ready for control Once the energy storage system s PCS is in a ready mode the PCS will take over control of the backup supply source by transf...

Страница 20: ...Kx State Backup Panel Supply Source Utility Interactive Initializing power up O O NC Grid Sleep Standby default state following initialize O C NO PCS Active Sleep EMS commanded C C NO PCS Grid connected no charge discharge EMS commanded C C NO PCS Charging Discharging EMS commanded C C NO PCS Fault self clearing O C NO PCS Service mode resettable O C NO PCS Offgrid Offgrid voltage control C O NO P...

Страница 21: ...19 THIS PAGE INTENTIONALLY LEFT BLANK ...

Отзывы: