10.2 Parallel Communication Cable Connection
For parallel communication, CAT 5 cables are needed. When using common batteries, BMS cable needs to
be connected to the master unit. The inverter shares the BMS information by inter-unit parallel
communication cable.
10.3 Parallel Operation Notes
1) Make sure all the units in parallel are with the same software version. USER->INQUIRE->FIRMWARE
2) Please check the diagram above. The common battery use is supported by default for maximizing the
system efficiency. The BMS cable should be connected to the master inverter.
3) Connect the loads of the two inverters together first. It should be noted that the grid power line and
the load line of the two inverters should be roughly the same length.
4) Make sure the CT Limiter sensor is installed properly. If the load is connected outside the inverter, user
need to choose a common CT and make sure the CT ratio is right (the default 90A CT ratio is 1:1000, no
need to change). The common CT is only needed to be connected to the master inverter. Please install CT
on every unit’s incoming electrical service wire on L1 and L2(see diagram) when choosing independent
CT.
5) Please check the master and slave setting by screen and make sure all the setting are same.
49
Содержание 8KEXP-240
Страница 4: ...2 Safety 2 1 Important Safety Instructions 4...
Страница 9: ...3 4 Dimension 3 5 Terminals of PV inverter 9...
Страница 10: ...4 Technical Parameters 4 1 Inverter specification 10...
Страница 11: ...11...
Страница 12: ...12...
Страница 24: ...6 8 CT Installation instructions 24...
Страница 25: ...7 LCD Operation 7 1 Control Panel 7 2 Instructions for LED Indicator 25...
Страница 26: ...7 3 Instructions for the use of three modes 26...
Страница 27: ...27...
Страница 28: ...8 LCD Operation 8 1 LCD Interface Error information System setting1 System setting2 System setting3 28...
Страница 30: ...Battery interface Battery current interface Battery current interface Grid connected Inverter Frequency 30...
Страница 31: ...LOAD ON GRID POWER INVERTER POWER LOAD POWER PER POWER 31...
Страница 32: ...Temperature State 8 2 SETTING State SET Password 32...
Страница 33: ...Setup System setting Work mode 33...
Страница 34: ...Peak shift work time EPS enable Battery wake up 34...
Страница 35: ...REMOTE CTRL START DELAY PV INPUT MODE Anti Reverse ARC ENABLE 35...
Страница 36: ...BUTTON ENABLE BATTERY SETTING BATTERY TYPE Lead acid battery parameter 36...
Страница 37: ...DISC DEPTH BAT COMM 37...
Страница 38: ...Grid standard Grid set RUN SETTING 38...
Страница 39: ...REACT MODE GRID POWER DISCHARGE POWER 39...
Страница 40: ...CHARGE POWER PV POWER VAC MIN VAC MAX GRID FREQUENCY MIN 40...
Страница 41: ...GRID FREQUENCY MAX ACTIVE REF 485 Address BAUD RATE 41...
Страница 42: ...LANGUAGE BACKLIGHT DATE TIME Clear history PASSWORD 42...
Страница 43: ...MAINTENANCE FACTORY RESET INQUIRE INVERTER MODULE 43...
Страница 44: ...MODULE SN FIRMWARE RUNNING RECORDS DIAGNOSE STATISTIC 44...
Страница 46: ...46...
Страница 47: ...47...