3. Operation
18
3.9
Decommissioning Check List
√
Required action
1)
Switch off the load.
2)
Open / Unlock EFOY ProEnergyCase.
3)
Switch the EFOY Pro fuel cell manually off via the operating panel .
4)
Switch off the main switch of the EFOY ProEnergyCase.
5)
Disconnect the load from the solar charge controller.
6)
Disconnect the solar module from the solar charge controller.
7)
Disconnect the batterie(s).
8)
Disconnect the charging cable and the data line of the operating panel from the
EFOY Pro fuel cell.
9)
Disconnect the exhaust hose. Protect it against contamination and seal the
exhaust gas duct with protective cap.
10)
Disconnect the fuel cartridge connector(s) from the EFOY fuel cartridge.
11)
Close the EFOY fuel cartridge(s) with the protective cap.
12)
Remove the EFOY fuel cartridge(s) from the EFOY ProEnergyCase.
13)
Remove the batterie(s) from the EFOY ProEnergyCase.
14)
Remove the EFOY Pro fuel cell from the EFOY ProEnergyCase.
15)
Secure loose cables for transport.
16)
Close and lock the EFOY ProEnergyCase.
To switch off the EFOY Pro fuel cell, please refer to the EFOY Pro user manual.
CAUTION!
Do not store or install the EFOY Pro fuel cell at temperatures below 0 °C as
long as it is not connected to a battery/ voltage supplier.
CAUTION!
Transport the EFOY ProEnergyCase only without inserted EFOY Pro fuel cell,
batteries and fuel cartridges. Carry and lift the EFOY ProEnergyCase only in
twos.