3. Operation
16
3.7
Connecting Load and Solar Module
*Example illustration: Steca PRS 2020
Please read the user manual of the solar charge
controller carefully prior to installing and connecting
loads and solar module via the integrated solar charge
controller.
Loads with a higher current consumption than the
device output can be directly connected to the battery.
However, the solar charge controller deep discharge
protection will no longer intervene. Loads connected in
this manner must also be separately fused.
Depending on the version of the EFOY ProEnergyCase there will be a cable gland or a plug
as connection for the load (see document “specific product information”)
*Example illustration
Cable gland: The cable glands are in the package of the
accessories. Please screw them on instead of the blind
plugs. Feed the load and solar module connection cable
each through one of the two cable glands on the EFOY
ProEnergyCase. Connect the load and solar module cables
directly to the solar charge controller.
*Example illustration
Plug: Please refer to the enclosed manual assembly and
wiring instruction for wiring operations.
INFO:
If the outer plugs are not in use the caps must be used to prevent
contamination of the plugs.
INFO:
Connect loads that must not be deactivated by the solar charge controller deep
discharge protection, e.g.: emergency lights / radio connection directly to the
battery.