background image

UP2500

 | Manual

 

5

 

 

2)

 

Before installation, be sure to cut off the grid power and make sure the battery is in the turned-off mode

 

3)

 

Wiring must be correct, do not mistake the positive and negative cables, and ensure no short circuit with 

the external device 

 

4)

 

It is prohibited to connect the battery and AC power directly

 

5)

 

The embedded BMS in the battery is designed for 24VDC, please DO NOT connect battery in series

 

6)

 

Battery must connect to ground and the resistance must be less than 0.1Ω

 

7)

 

Please ensured the electrical parameters of battery system are compatible to related equipment 

 

8)

 

Keep the battery away from water and fire. 

 

1.2 In Using 

1)

 

If  the  battery  system  needs  to  be  moved  or  repaired,  the  power  must  be  cut  off  and  the  battery  is 

completely shutdown 

 

2)

 

It is prohibited to connect the battery with different type of battery.

 

3)

 

It is prohibited to connect batteries with faulty or incompatible inverter

 

4)

 

It is prohibited to disassemble the battery (QC tab removed or damaged);

 

5)

 

In case of fire, only dry powder fire extinguisher can be used, liquid fire extinguishers are prohibited

 

6)

 

Please  do  not  open,  repair  or  disassemble  the  battery  except  staffs  from  Pylontech  or  authorized  by 

Pylontech.  We  do  not  undertake  any  consequences  or  related  responsibility  which  because  of  violation  of 
safety operation or violating of design, production and equipment safety standards. 

 

 

2. 

Introduction 

 

UP2500 lithium iron phosphate battery is one of new energy storage products developed and produced by 

Pylontech, it can be used to support reliable power for various types of equipment and systems. UP2500 is 

especially suitable for application scene of high power, limited installation space, restricted load-bearing and 

long cycle life.

 

UP2500  has  built-in  BMS  battery  management  system,  which  can  manage  and  monitor  cells  information 

including voltage, current and temperature, further provide protection base on above information. The BMS 

can also balance cells during charging to extend cycle life. 

 

Multiple batteries can connect in parallel to expand capacity and power in parallel for larger capacity and longer 

power supporting duration requirements.

 

2.1 Features:

 

 

The whole module is non-toxic, non-polluting and environmentally friendly;

 

 

Cathode material is made from LiFePO4 with safety performance and long cycle life;

 

 

Battery management system (BMS)has protection functions including over-discharge, over-charge, 

over-current and high/low temperature;

 

 

The system can automatically manage charge and discharge state and balance current and voltage of 

each cell;

 

Содержание PYLONTECH UP2500

Страница 1: ...Lithium Ion storage system Pylontech UP2500 manual Version 1 3 Part number AKPLX124100BXA2U...

Страница 2: ...uces UP2500 from Pylontech Please read this manual before you to install the battery and follow the instruction carefully during the installation process Any confusion please contact Pylontech immedia...

Страница 3: ...3 1 Schematic Diagram of Solution 12 3 2 Danger label 12 3 3 Tools 13 3 4 Safety Gear 13 4 INSTALLATION AND OPERATION 14 4 1 Package Items 14 4 2 Installation Location 15 4 3 Grounding 16 4 4 Install...

Страница 4: ...ration temperature or humidity range listed in manual 5 Do not expose cable outside 6 Do not connect power terminal reversely 7 All the battery terminals must be disconnected for maintenance 8 Please...

Страница 5: ...r authorized by Pylontech We do not undertake any consequences or related responsibility which because of violation of safety operation or violating of design production and equipment safety standards...

Страница 6: ...self discharge up to 6 months without charging it on shelf no memory effect excellent performance of shallow charge and discharge Working temperature range is from 10 to 55 Charging 0 55 discharging...

Страница 7: ...5 Recommend Charge Discharge Current A 55 Max Charge Discharge Current A 85 Peak Charge Discharge Current A 100A 15sec Communication RS485 CAN Configuration max in 1 battery group 20pcs Working Temper...

Страница 8: ...eck below table LED Indicators Instructions for the detailed definition Protection Protection light RED LED to show the battery is under BMS protection Combine with SOC LEDs to show which kind of prot...

Страница 9: ...tage Discharge MOS OFF Possible reason discharging over current Low Voltage Short circuit Reverse polarity Charge and discharge MOS all OFF Possible reason Over Low Temperature MOS Over Temperature BM...

Страница 10: ...between multiple parallel batteries and between master battery to host equipment CAN CAN Communication Terminal RJ45 port follow Pylontech Low voltage CANBUS protocol for communication between master...

Страница 11: ...r each single module each terminal can achieve charging and discharging function It must keep pressing this Lock Button during pulling out the power plug BMS function Protection and Alarm Management a...

Страница 12: ...UP2500 Manual 12 3 Safe handling of lithium batteries Guide 3 1 Schematic Diagram of Solution 3 2 Danger label...

Страница 13: ...sulated tools to prevent accidental electric shock or short circuits If insulated tools are not available cover the entire exposed metal surfaces of the available tools except their tips with electric...

Страница 14: ...ing and check the Packing List 1 For battery module package Two power cables and one communication cable for each battery package Grounding cable Two long power cables max current capacity 120A and on...

Страница 15: ...floor is flat and level There are no flammable or explosive materials The ambient temperature is within the range from 10 C to 40 C The temperature and humidity is maintained at a constant level Ther...

Страница 16: ...e of the battery pack 4 3 Grounding Grounding cables shall be 10AWG or higher yellow green cables After connection the resistance from battery grounding point to Ground connection point of room or ins...

Страница 17: ...UP2500 Manual 17 4 4 Installation A Put battery modules into the cabinet and connect the cables 1 Put the battery into the cabinet follow below picture 2 Fix each module with the cabinet with 4 screws...

Страница 18: ...UP2500 Manual 18 3 Connect the cables between battery modules including grounding cables follow below picture 4 Connect the cables to inverter...

Страница 19: ...airs of external power cable connect as A D and B C For more than 2 pairs of external cable need split the battery module into another string to further handle the connection There shall be a manual d...

Страница 20: ...Press the Start Button SW of master battery to power on all the battery LED light will be on after master battery starts If all the battery LED lights on and then off which means the battery system i...

Страница 21: ...ove 55 or under 10 the battery could not work Solution turn off the battery module move battery to the normal operating temperature range between 10 and 55 b Over Current If current is 100A battery pr...

Страница 22: ...ntaminated area and seek medical attention Contact with eyes Rinse eyes with flowing water for 15 minutes and seek medical attention Contact with skin Wash the affected area thoroughly with soap and w...

Страница 23: ...ency Maintenance 1 It is required to charge the battery at least once every 6 months for this charge maintenance make sure the SOC is charged to higher than 90 2 Every year after installation The conn...

Страница 24: ...UP2500 Manual 24 Rheinwaldstra e 34 78628 Rottweil Tel 0741 174510 Mail info effekta com...

Отзывы: